PPE
FORKLIFTS
&
CRANES
FIRE
EMERGENCIES
SLIPS / TRIPS / FALLS
GENERAL
SAFETY
100

"PPE" stands for?

Personal Protective Equipment.

100

Must be completed before you can operate a crane or forklift.

Forklift & Crane training.

100

The meeting point to gather if we evacuate for an emergency.

North gravel lot of the employee parking lot.

100

Best method of preventing daily slips/trips/falls.

Good housekeeping.

100

"OSHA" stands for?

Occupational Safety & Health Administration.

200

PPE required in all areas of production.

Safety Glasses and Steal Toe Shoes.

200

At the beginning of your shift, you need to move a large motor from point A to point B with a crane.  You should first:

Perform the daily crane inspection.

200

Where our two AEDs are located.

On beam #11 in the middle of the shop.

Outside the lunchroom.

200

How quickly OSHA stipulates spills should be reported and cleaned up.

Immediately

200

Provides critical information for safe handling, storage, emergency procedures and required PPE for a chemical or mixture.

Safety Data Sheet or SDS.

300

The frequency you should inspect your PPE to make sure it's in good condition and working properly.

Before each use.

300

When going up or down a ramp with your forklift, the load is kept in this position.

The upgrade position.

300

Two things you do when you discover a fire.

Assist anyone in danger

&

Call 911

300

Should be done to a damaged walking-working surface if it cannot be repaired immediately.

Guard the hazard to prevent employees from using the surface.

300

Using your leg muscles, keeping your back straight and not bending at the waist is what?

The proper way to lift a heavy object.

400

PPE required when you are passivating parts.

Steel Toe Shoes, Goggles and Gloves.

400

Additional PPE you must wear if you have to lift a load on the crane more than 5 feet.

A hard hat.  

400

"PASS" stands for?

Pull, Aim, Squeeze & Sweep.

400

Fall protection is required when the working height reaches this height.

4 feet

400

The purpose of a LOTO program.

To control and prevent the accidental start-up/activation of machinery while they are being repaired, cleaned or serviced.

500

PPE required when you are welding.

Steel Toe Shoes, Welding Helmet, Welding Jacket or Welding Apron and Welding Gloves.

500

The minimum number of wraps that should be left on the drum when a crane hook is in its lowest position.

500

The most important rule to follow in a fire emergency.

Always having an exit plan.

500

The 3-Point System/3 Points of Contact means what?  

That three of your four limbs are in contact with the ladder at all times.

500

Required to understand LOTO, but are not qualified to apply locks or tags themselves.

An Affected Employee.

M
e
n
u