Define Me
River Values
Section 7(a)
Planning
Mixed Lot.
100

A River and the adjacent area within the boundaries of a designated river, or a river and the adjacent area within one-quarter of a mile of the banks of a congressionally designated study river

What is the River Corridor

100

The values for which a river was established

What are free-flowing condition, water quality, and outstandingly remarkable values

100

Direct and Adverse Effect

The evaluation standard for water resources projects within the designated reach of the river and tributaries within the boundary

100

CRMP

What is the acronym for a comprehensive river management plan
100

320 acres per mile

How many miles per river mile be included in the final boundary of a WSR?

200

The area within the ordinary high watermark of a river; a criteria for a 7(a) determination.

What is the bed or bank of the river?

200

Fish and Wildlife, Geologic, Paleontologic, Recreational, Scenic

What are the values for which the ORV's for which the Niobrara was designated

200

Secretary of Interior or agriculture through the river-administering agency

Who is responsible for making section 7(a) determinations?

200

congressionally designated not state administered

What rivers are required to have a CRMP?

200

Section 10(a) is know as this...

What is the anti-degradation and enhancement policy?

300
A license, grant or loan that is subject to a 7(a) determination

What is Federal Assistance

300

Free-flowing condition and ORV's

What are the WSR eligibility criteria?

300

Invade the area or unreasonably diminish.

What is the evaluation standard for water resources projects upstream, downstream, and on tributaries outside of the boundary?

300

Federal Register Notice

What is required upon completion of CRMP (also after classification and boundaries establishment?

300

Provides a baseline condition and framework for intensity of land management activities based on level of infrastructure.

What is river Classification?

400

Encroach or intrude upon

What is invade?

400

A segment by segment articulation of values, the basis for management direction, management actions, corridor boundary, and baseline monitoring

What is the ORV Report?

400

bridge projects, bank restoration or revetment, river access facility, in-stream fish or wildlife habitat improvement project

What are federally-assisted water resources projects?

400

3 years after designation

When are CRMP's suposed to be complete?

400

This does not determine the level of impacts to ORVs that are allowed

What is classification?

500

Any action carried on with federal assistance affecting the free-flowing characteristics or scenic or natural values of the Wild and Scenic River or study river

What is construction?

500

Rare, Unique and Exemplary, river-related, and of Regional or National Significance

What are the criteria that determine an ORV?


500

On or directly affecting

What is the evaluation standard/prohibition for new FERC hydroelectric dams

500

ORV descriptions, desired future conditions, user capacities, Water quality and instream flow needs, monitoring strategies, lands strategies, etc

What are the elements of a CRMP?

500

The secretary of the interior and congress can do this to the National WSR System.

What is add rivers?

M
e
n
u