This tool is used to measure length and is commonly carried by every carpenter.
What is a tape measure?
This phrase reminds carpenters to check their measurements before making a cut.
What is "measure twice, cut once"?
This vertical framing member is commonly installed at 16 inches on center.
What is a stud?
IBC stands for this.
What is International Building Code?
This type of PPE protects your eyes from flying debris.
What are safety glasses?
This tool has a bubble and is used to check whether something is level or plumb.
What is a level?
This is the actual finished size of a typical 2×4.
What is approximately 1½" × 3½"?
O.C. is an abbreviation commonly found on construction drawings. What does it mean?
What is on center?
Player steel! If you answer correct you can take any player from any team!
This is the building code used by Massachusetts.
What is the Massachusetts State Building Code?
This is one of the most important things you should do before using an unfamiliar tool.
What is receive proper instruction/training?
This tool is shaped like a triangle and is commonly used to mark 90-degree and 45-degree cuts.
What is a speed square?
This material is commonly identified by the abbreviation PT and is used where resistance to moisture and decay is needed.
What is pressure-treated lumber?
Point trade!!!!
You can choose to trade your points with another team or keep your own! After this question..
This framing member is installed horizontally and supports a floor system.
What is a joist?
This is the Massachusetts regulation number associated with the State Building Code.
What is 780 CMR?
Lose a turn! If you get this correct another team of your choice will lose a turn. If you get it wrong, you will lose a turn>
This is the Massachusetts regulation number associated with the State Building Code.
What is 780 CMR?
This hand tool is used to remove material from wood and has a sharp cutting edge.
What is a chisel?
This structural member is installed over a door or window opening to support the load above it.
What is a header?
This framing member supports a roof and is typically installed at an angle.
What is a rafter?
A carpenter shouldn't rely only on memory when determining code requirements for this reason.
Building codes can change, and requirements vary depending on the construction situation. Current requirements should be verified.
Why is good housekeeping important on a construction site?
It reduces trip hazards, improves efficiency, prevents accidents, and creates a safer work environment.
Wager any amount up to twice their current score.
A carpenter needs to lay out a stair stringer. They need to accurately mark the rise, run, plumb cuts, and level cuts on the board.
Which tool would be the best choice for this job, and explain why.
A framing square. It can be used to lay out the rise and run of stairs and establish accurate plumb and level cuts.
Explain the difference between nominal lumber dimensions and actual lumber dimensions.
Nominal size is the lumber's commonly stated size, such as 2×4. Actual size is the finished dimension, approximately 1½" × 3½".
Explain why accurate layout is important before framing a wall.
Accurate layout ensures openings, studs, corners, and other components are placed correctly and helps prevent costly mistakes.
You're framing a new wall and aren't sure whether the design meets current code requirements. What should you do before proceeding?
Stop and verify the applicable current code requirements, plans, specifications, and/or consult the appropriate qualified person or building official.
ou are working with a partner and need to make a cut with a hand tool. Your partner is standing in the potential path of the tool. What should you do?
Stop, communicate with your partner, make sure the area is clear, and only proceed when it is safe.