What is the EPA ID number for the Distribution Center in El Dorado?
the DC is not required to have an EPA ID number as long as they generate less than 55 pounds per month.
They are CESQG status.
When do waste determinations need to be started?
All waste determinations are to be created at the generation point.
What are the top three requirements for the management of Universal Waste?
1) box is closed
2) box is labeled
3) label is dated with the first date waste is added to the box.
Hard copy manifest's go into the Manifest Book on site. How long do we have to keep them?
3 years.
What training is needed to sign waste manifests?
DOT and RCRA
Which landfill does the excluded wipes go?
Plumb Thicket
Bonus: Harper, Kansas
Who is required to file biennial waste reports?
Wichita - LQG
Can BG ship 4 drums of Used Oil in a single load if they use a Bill of Lading?
BG can only ship one container up to 55 gallons c in our vehicles.
When are the biennial waste reports due?
March 1st of even years