This is how many team members make up Haskell’s automation group
What is 45 and counting
This Atlanta based Haskell employee leads the packaging team operations
Who is Ginna Pratt
This is the main difference between FAT and SAT
What is the location of the tests? FAT performed at OEM Factory, SAT performed on site (this is the same for packaging equipment)
This is an example of a tool used in cross discipline design development
What is Revit / Clash Detection / Point Cloud Scan / Navisworks / Revizto
This is one difference between a simulation and an emulation
1. What its controlled by - software vc PLC
2. Use - rapid scenario vs test line controls
3. Detail - May or may not include all details vs behaves the same as the line will in real life
A simulation is controlled by the software itself. It is often used for rapid scenario analysis. It may or may not include all of the details of subject of the simulation, such as layout, sensors, and logic. An emulation is a virtual representation of a line controlled by a PLC. It is meant to test line controls and behaves the same as the line will in real life.
A recent aquisition by Haskell, Oreair provides these services
What is process/packaging electrical and controls installation services.
This is Haskell's role in most packaging projects
System Integrator - designing, specifying, buying, installing and commissioning full packaging lines
This is what the 'PAR' in ParBaking and ParFrying means
What is Partial
These are the disciplines that are stakeholders in the design of an exterior structural pipe rack.
Who is FULL TEAM!
This is so much cross discipline work, it often requires an integration resource to coordinate across disciplines (not just facilities disciplines, but also process, packaging, and controls automation) to ensure all engineering components are considered, but also operability, maintainability, constructability, quality, safety client considerations are discussed.
This is a project that recommends one or a series of upcoming projects to meet future demand.
What is a Master Planning Project?
One of which shares its name with the shape of a strand of DNA, name two recent EPC projects the automation team has been a part of
What are Project Helix (Diageo Plainfield), Project Opus (Diageo Relay), Project ECO (Gallo SC), Project Wave (Hood Batavia), Hood Winchester, Campari Industrial Waste Water, Project Flask, HP Hood Winchester, HEB Carafe or Happy
Name three ways Haskell reduces risk during a packaging project
What are
Early and detailed planning, Cross-disciplinary integration, Vendor scoring matrices, Detailed RFQs & technical specs, Pre-FAT checklists, Executing FATs, Progressive commissioning and testing plans with dedicated on-site startup teams, Commissioning plans coordinated with construction, Early alignment of SAT metrics across OEM, Packaging, and greater Haskell team potentially using SA modeling to validate metrics, Performance validation against design intent, Transparent client communication
This three letter acronym is the starting point for all process design and defines the requirements of the project in a diagram.
What is PFD (Process Flow Diagram) or BFD (Block Flow Diagram)
This is the order of startup for a multi-disciplinary system
What is Utilities, Wastewater, Process, Packaging
This is the vertical operations group under which SA falls and its President
What is D&C and Who is Frank Mangin?
Haskell is a Silver Level Partner of this major automation provider that shares a name with the famous American painter of works like "Freedom of Want" and "Freedom of Speech"
Rockwell Automation
Haskell's packaging competencies include FAT/SAT Support and OEE Analysis & throughput modeling. Name two more.
What is packaging line engineering, Layout design, controls and automation, installation & commissioning, turnkey EPC delivery of packaging systems
You might call these people at your hotel for fresh towels, what are the two most common ways to mitigate Dust Hazards?
What is dust collectors and housekeeping
This role is critical in a multidisciplinary project to ensure the design is sound across all disciplines
What is the EPC Design Integrator
This college degree is typical on the System Analytics team
What is Industrial Engineering (also acceptable -systems engineer)
These are 3 examples of automation design deliverables
What are Network Architectures, Control Panel Layouts and BOMs, Control System Schematics, Installation Bid Packages, Instrumentation Specifications
The acquisition of this company started the packaging team at Haskell (Bonus 1 point for the year of acquisition)
E2M (2010)
This is when information for the Utility List is usually received.
What is after a PO with an OEM is executed. (Prior to that we can only provide preliminary estimates or info from previous projects)
Defined as the imparting or exchanging of information or news, this is the most important element of an integrated startup team.
What is communication
These are the three things measured in an OEE assessment
What is Performance, Availability, and Quality