Key Aspects of Conversion
Spec Lab Formula
General Cost
Examples of Conversions
BONUS
100

List one of the four Aspects of Infrastructure

*Power

*Water

*Gas

*Fire Protection

Congrats! You won a gift card!

100

What are 2 of the 6 requirements a Lab Area must have?

a. Main open lab area with 50% build-out of lab casework.

b. 1 or 2 fume hoods (6' or 8')

c. A few lab sinks

d. Casework can be mobile or fixed

e. Utility / loading room

f. A couple Lab support rooms (12' x 15' approx.)

*Congrats you won a gift card!

100

What is the typical range for the cost per square foot on General Core and Shell Building Upgrades?

$50-$100 per square foot

Congrats! You won a bottle of wine!

100

From today's training, how many Types of Conversions are there?

4

Congrats! You won a gift card!

100

What Type of Lab Requires More Equipment?

Chemistry Lab

Congrats! You won a bottle of Grey Goose! 

200

List 3 of the 10 Key Aspects of Conversion

1. Construction Type

2. Infrastructure

3. Zoning

4. Parking capacity

5. Restroom fixture Count

6. Floor-to-floor Height

7. Elevator

8. Upper floor structural capacity

9. Loading area

10. Fire Rating for Lab Control Areas

Congrats! You won a gift card!

200

How many air changes per hour are required for the HVAC in a lab setting?

10 changes per hour

Congrats! You won a gift card!

200

What is the typical range of the cost per square foot for the overall project? (Including General Core & Shell building upgrades, Office Upgrades, and Lab Side improvements)

$200-$300 PER SF for the final cost

Congrats!  You won a gift card!

200

List an Examples of a Type of Conversion

A. Ground Up

B. Conversions with Spec Lab

C. Tenant Specific

D. Conversion Shell Only

Congrats! You won a gift card!

200

What is an example of a practice occurring in a biology lab that requires specialized equipment?

a. Cell and Tissue Culture

b. Imaging

c. Microscopy