Canned Cycles
More Canned Cycles
Program Applications for Canned Cycles
More Program Applications for Canned Cycles
Take a Chance
100

What G code is used to specify a counter-boring cycle?

G84

G81

G83

G80

G73

G82

G76

G82

100

What G code is used to specify a standard drilling cycle?

G80

G76

G81

G73

G83

G82

G84

G81

100

To determine the distance between the bolt circle centre and any hole on a bolt circle pattern in the X axis:

multiply the sine of the hole's angle times the bolt circle radius.

divide the sine of the hole's angle by the bolt circle radius.

divide the cosine of the hole's angle by the bolt circle radius.

multiply the cosine of the hole's angle times the bolt circle radius.

multiply the cosine of the hole's angle times the bolt circle radius.

100

To determine the distance between the bolt circle centre and any hole on a bolt circle pattern in the Y axis:

divide the cosine of the hole's angle by the bolt circle radius.

multiply the sine of the hole's angle times the bolt circle radius.

divide the sine of the hole's angle by the bolt circle radius.

multiply the cosine of the hole's angle times the bolt circle radius.

multiply the sine of the hole's angle times the bolt circle radius.

100

What G code is used to specify a chip-breaking peck drilling cycle?

G82

G80

G84

G81

G73

G76

G83

G73

200

What G code is used to specify a deep-hole peck drilling cycle?

G76

G81

G80

G82

G73

G83

G84

G83

200

What G code is used to specify a retract to the initial plane?

G90

G98

G91

G99

G98

200

You determine the lead of a tap by:

dividing the tap diameter by 0.3.

multiplying the tap length times 0.3.

multiplying the number of imperfect threads times the tap's pitch.

multiplying 0.3 times the tap diameter.

multiplying the number of imperfect threads times the tap's pitch.

200

The G code used to specify a temporary shift of the program zero point is:

G53

G52

G51

G54

G52

200

What must you take into account with a counter-bore to ensure it clears the workpiece between holes?

the length of the pilot

300

If you are using the G76 fine boring cycle and you know the boring bar tip is pointing in the Y positive direction when the spindle is at its orient position, which of the following words do you include in the G76 command to cause the boring bar to move in the appropriate direction at the hole bottom.

I0.001

I-0.001

J0.001

J-0.001

J-0.001

300

What G code is used for a left-hand tapping cycle?

G74

300

In the pattern shown here, what is the dimension between hole centres in the X axis for the top row of holes?

1.4142

300

What is the lead on a 3/4 inch diameter high speed steel drill that has a 118 degree point angle?

0.225"

300

What G code is used to specify a tapping cycle?

G73

G81

G76

G84

G83

G82

G80

G84

400

How many commands are required to machine a hole if it is programmed with a canned cycle?

One

400

What word used in a G73 and G83 canned cycle specifies the peck drilling amount per peck?

Q

400

To ensure that a cutting tool truly breaks through the bottom surface, you must increase the hole depth by about:

0.030"

400

If included in a hole machining canned cycle command, what does letter address L specify?

the number of times the canned cycle command is executed

400

Which G code instates the polar co-ordinate system?

G16

500

Define the two planes, the R plane and the initial plane, that you use to avoid obstructions when using hole-machining canned cycles.

R plane: The Z surface specified by the R word in the canned cycle command. This position is usually right above the work surface.

Initial plane: The last programmed Z position prior to the canned cycle command.

500

Name the two things all hole-machining canned cycles share in common.

- All hole-machining canned cycles are modal

- All hole-machining canned cycles cause four predetermined activities. They rapid to the hole location in XY, rapid to the R plane, machine the hole and retract from the hole.

500

In a canned cycle commanded by G90, how many holes are drilled with an L word of L5?

1 hole

500

When using the polar co-ordinate system, what does letter address X specify?

the radial co-ordinate

500

What word used in a G76 canned cycle specifies the amount and direction of move-over in X at the hole bottom?

I