What G code is used to specify a counter-boring cycle?
G84
G81
G83
G80
G73
G82
G76
G82
What G code is used to specify a standard drilling cycle?
G80
G76
G81
G73
G83
G82
G84
G81
To determine the distance between the bolt circle centre and any hole on a bolt circle pattern in the X axis:
multiply the sine of the hole's angle times the bolt circle radius.
divide the sine of the hole's angle by the bolt circle radius.
divide the cosine of the hole's angle by the bolt circle radius.
multiply the cosine of the hole's angle times the bolt circle radius.
multiply the cosine of the hole's angle times the bolt circle radius.
To determine the distance between the bolt circle centre and any hole on a bolt circle pattern in the Y axis:
divide the cosine of the hole's angle by the bolt circle radius.
multiply the sine of the hole's angle times the bolt circle radius.
divide the sine of the hole's angle by the bolt circle radius.
multiply the cosine of the hole's angle times the bolt circle radius.
multiply the sine of the hole's angle times the bolt circle radius.
What G code is used to specify a chip-breaking peck drilling cycle?
G82
G80
G84
G81
G73
G76
G83
G73
What G code is used to specify a deep-hole peck drilling cycle?
G76
G81
G80
G82
G73
G83
G84
G83
What G code is used to specify a retract to the initial plane?
G90
G98
G91
G99
G98
You determine the lead of a tap by:
dividing the tap diameter by 0.3.
multiplying the tap length times 0.3.
multiplying the number of imperfect threads times the tap's pitch.
multiplying 0.3 times the tap diameter.
multiplying the number of imperfect threads times the tap's pitch.
The G code used to specify a temporary shift of the program zero point is:
G53
G52
G51
G54
G52
What must you take into account with a counter-bore to ensure it clears the workpiece between holes?
the length of the pilot
If you are using the G76 fine boring cycle and you know the boring bar tip is pointing in the Y positive direction when the spindle is at its orient position, which of the following words do you include in the G76 command to cause the boring bar to move in the appropriate direction at the hole bottom.
I0.001
I-0.001
J0.001
J-0.001
J-0.001
What G code is used for a left-hand tapping cycle?
G74
In the pattern shown here, what is the dimension between hole centres in the X axis for the top row of holes?

1.4142
What is the lead on a 3/4 inch diameter high speed steel drill that has a 118 degree point angle?
0.225"
What G code is used to specify a tapping cycle?
G73
G81
G76
G84
G83
G82
G80
G84
How many commands are required to machine a hole if it is programmed with a canned cycle?
One
What word used in a G73 and G83 canned cycle specifies the peck drilling amount per peck?
Q
To ensure that a cutting tool truly breaks through the bottom surface, you must increase the hole depth by about:
0.030"
If included in a hole machining canned cycle command, what does letter address L specify?
the number of times the canned cycle command is executed
Which G code instates the polar co-ordinate system?
G16
Define the two planes, the R plane and the initial plane, that you use to avoid obstructions when using hole-machining canned cycles.
R plane: The Z surface specified by the R word in the canned cycle command. This position is usually right above the work surface.
Initial plane: The last programmed Z position prior to the canned cycle command.
Name the two things all hole-machining canned cycles share in common.
- All hole-machining canned cycles are modal
- All hole-machining canned cycles cause four predetermined activities. They rapid to the hole location in XY, rapid to the R plane, machine the hole and retract from the hole.
In a canned cycle commanded by G90, how many holes are drilled with an L word of L5?
1 hole
When using the polar co-ordinate system, what does letter address X specify?
the radial co-ordinate
What word used in a G76 canned cycle specifies the amount and direction of move-over in X at the hole bottom?
I