Contingency Operations
Shelters
Mortuary Affairs
Babington Airtronic Burner
Hodgepodge
100
What system provides the ability to deploy packages of personnel and/or equipment with a single entry on the Time Phased Force Deployment Data (TPFDD) list?
What is Unit Type Code
100
What are the dimensions of the small shelter system?
20L X 32.5W X 10H
100
How many tags are filled out for each human remains pouch?
What is 2
100
The _____ must "see" dark prior to allowing the burner to light.
What is photocell
100
What are the typical base beddown priorities?
What are beddown of Forres, Mission Readiness, Security and Quality of Life.
200
What system was developed to meet general force module timeline scenarios by creating modular asset packages?
What is the BEAR
200
Installing the purlins, start with ___ colored purlins on one end and work toward the other end where ____ colored purlins are used.
What is red, yellow
200
The Casualty Collection point is normally located near a ______.
What is medical facility
200
A small ___ watt double shafted motor powers the BAB.
What is 75
200
What UTC provides initial MRE support for 1100 personnel, two meals per day for one and a half days, which would total 3,456 MREs.
What is RFSEM.
300
Who is the main point of contact for beddown planning at a site?
What is Civil Engineering
300
The 18" guy spikes are places approximately ___ out from the side of the shelter.
What is 36"
300
The mortuary officer coordinates with ____ to determine if GPS capability exists to plot remains and personal effects locations during search and recovery operations
What is Civil engineer
300
The recommended source of fuel for the BAB is ______?
What is DIESEL
300
What module brings the initial Basic Expeditionary Airfield Resources and follow on housekeeping packages?
What is "Establish the Airbase Module"
400
Plans for expansion should be considered during which phase of planning?
What is Pre-deployment Planning
400
DAILY DOUBLE! Using the TEMPERS, a typical set up for lodging is ___ sections and requires ___ personnal per arch assembly for set up.
What is 4,2
400
The MACP'S main purpose is to move remains, along with accompanying PE, to the TMEP as quickly as possible for processing and indentification.
What is FALSE
400
The BAB is interchangable with the Tray Ration Heating System and The Field Sanitatin Unit.
What is TRUE
400
This agency is the main contact for planning at the beddown site.
What is Civil Engineering.
500
During redeployment, it is not necessary to ensure all material is clean and serviceable before repacking?
What is FALSE
500
What is used as a passageway or entry way?
What is Vestibule
500
Remains suspected to have UXO'S are reported via the UCC to the ________ representative in the EOC.
What is Civil Engineer
500
The burner must have three things to ensure proper operation of the burner. They are; ____,_____, and ______.
What is Fuel, Air, and Spark
500
Daily Double! This plan is used by the AF units and personnel to plan employment, reception, beddown and sustainment of air and space expeditionary forces.
What is the "Expeditionary Site Survey Plan".