What are the three core values of NGCP?
Integrity, Competence and Passion for Excellence
What refers to a written list of deficiencies of the project required to be corrected by the Contractor prior to acceptance of the completed works?
Punchlist
What does CQWS stand for?
Construction Quality and Workmanship Standards
What does SEIL stand for?
Site and Equipment Identification and Labeling
The piping material for the domestic water pumping system shall be galvanized iron Schedule _____.
Schedule 40
Fill in the blanks.
NGCP Vision
To build the _________ and maintain the best power utility practice in Southeast Asia, with the collective efforts of a world-class professional work force.
strongest power grid
What refers to a duly organized, legal and existing corporation or company contracted by NGCP for a specific purpose, and which can also be referred to as one of the parties of the contract?
Contractor
Which type of steel support structure has advantages primarily in terms of strength, stability, and ease of fabrication - Lattice type of tubular?
Tubular
True or False. Neutral Bushing must not be insulated.
False
NGCP-CW-06.01-1001.02-00: Neutral Bushing shall have one insulated copper bus bar.Copper busbar shall be reliably connected to the groundinggrid to at least two different sides. The neutral busbar shallbe identified in Black color
For Transformer Deluge Water Spray System, pipes to be exposed shall be applied and painted with one (1) coat of epoxy primer and top coat of epoxy paint. What color should its final coat be?
Red
Fill in the blanks.
NGCP MISSION
To contribute to the nation's social and economic development and ________________ by efficiently developing and adequately operating the power grid to provide reliable electricity transmission service.
satisfy our stakeholder's needs
What is the IMS Form No. of Daily Inspector's Report (DIR)?
FM-PE-ECD-06AA
_____________ and Installation Precision are the top two common findings during Joint Final Inspection in Substation Projects (Bulletin No. 2024-16).
Workmanship
What is the standard color of equipment grounding cable?
Green or Yellow-Green horizontal stripes
Equipment grounding must be directly connected to ground mat.
True or False. In fire hydrant piping system, pipes to be embedded shall be first painted with one (1) coat of epoxy primer and then wrapped with anti-corrosion material (jute sack) and final coat of coal tar.
FALSE. Pipes to be embedded shall be first painted with two (2) coats of epoxy primer and then wrapped with anti-corrosion material (jute sack) and final coat of coal tar.
NGCP Code of Conduct
What type of offense carries a penalty of suspension of eight (8) to 20 working days?
Moderate offense
In the new revised CPER form of ongoing projects, what is the relative weight of contractor's monthly submission under Part C. Compliance to Documentary Requirement?
5%
What is the required gravel size and gravel paving thickness?
Size must be between 12-31 mm and gravel paving thickness of 150mm (6in) (NGCP-CW-05.01-1024.01-00)
Electrical Works: What is the correct phase color coding?
ø A – Red, ø B – Yellow, ø C - Blue
An ____________ shall be installed between the equipment and the foundation.
Anti-vibration Damper or Rubber Pad
NGCP Code of Conduct
Insubordination, or willful disobedience or intentional refusal of the employee to perform a lawful or reasonable order of a superior, falls under what offense type of offense?
It is classified as MAJOR OFFENSE under Rule 1, Section 3.
When is the effectivity date of PM-PE-ECD-06?
December 1, 2023
All anchor bolts, nuts and washers, turnbuckles and tension bars shall have a strength of ASTM _________.
ASTM A307
What is the standard panel dimension (LxHxW)?
L: 800mm, H: 2200mm, W: 800mm
What is the clearance between the loop pipeline and the transformer body in a Transformer Deluge Water Spray System?
1000mm