Caldwell Plans
Code
DR Horton
Basic Construction
Warranty
100

What are the four plans we are currently building in Caldwell Crossing Section 2?

A. Cali, Kingston, Paula, Helga

B. Harris, Lakeway, Burnett, Kingston

C. Harris, Mitchell, Lakeway, and Cali

D. Harris, Mitchell, Lakeway, and Kingston

100

What is the current version of the IRC that we are required to build to? 

A. 2015

B. 2018

C. 2021

D. None of the above

100

Who is the founder of DR Horton?

A. Donald Ray Horton

B. Donald Reginald Horton

C. Donald Ryan Horton

D. David Rutherford Horton

100

The stud that is placed at the side of an opening, under a header, to support it.

A. Cripple Stud

B. King Stud

C. Trimmer/Jack Stud

D. Common Stud

100

How long does DR Horton warranty landscape and trees for?

A. 90 Days

B. 6 Months

C. 1 Year

D. No Warranty

200

What is the only two-story plan we are currently building?

A. Perry

B. Michelle

C. Mitchell

D. Miguel

200

What is the maximum spacing for purlin braces?

A. 1'

B. 2'

C. 3'

D. 4'

200

What year was DR Horton founded?

A. 1968

B. 1976

C. 1978

D. 1986

200

On a set of plans, if something is called out to be 16"oc, what does that mean?

A. On Corner

B. On Center

C. One's Choice

D. Original Choice

200

How long does a homeowner have to register their hot water heater? 

A. 30 days after closing

B. 60 days after closing

C. 90 days after closing

D. 120 days after closing

300

What is the minimum PSI for pouring a slab in Caldwell?

A. 2000 psi

B. 2500 psi

C. 3000 psi

D. 3500 psi

300

Nails guards are required when piping, wiring, vents, etc. are installed through holes or notches in studs less than _____ inches from the nearest edge of the framing member. 

A. 1"

B. 1-1/4"

C. 1-1/2"

D. 1-3/4"

300

How many states does DR Horton build in?

A. 27

B. 33

D. 37

D. 41

300

What size of board makes a brick ledge?

A. 2x4

B. 2x6

C. 2x8

D 2x10

300

How long does a homeowner have to register their appliances?

A. 30 days after closing

B. 60 days after closing

C. 90 days after closing

D. 120 days after closing

400

What are the two plans we are currently building in Caldwell Crossing that have three full bathrooms?

A. Kingston and Cali

B. Cali and Lakeway

C. Lakeway and Mitchell

D. Mitchell and Harris

400

You need a weephole a minimum of every ___ inches.

A. 12"

B. 16"

C. 24" 

D. 33"

400

How many homes did the SE Division close in FY2024?

A. 705

B. 755

C. 805

D. 1205

400

How many king-size bricks make up one square foot? 

A. 2

B. 3.5

C. 4.5

D. 5.5

400

How long are roof leaks covered for?

A. 6 Months

B. 1 Year

C. 2 Years

D. 30 Years

500

What are two plans we are currently building in Caldwell Crossing with 10' attic ladders?

A. Harris and Kingston

B. Harris and Lakeway

C. Lakeway and Cali

D. Harris and Cali

500

If there is a conflict in the IRC between a general requirement and a specific requirement, the _______ requirement must apply. 

A. general

B. specific

C. the least restrictive

D. the most restrictive

500

How many homes has DR Horton closed? 

A. 800,000

B. 900,000

C. 1,000,000

D. 1,100,000

500

What temperature is required to pour concrete?

A. 32 degrees and rising

B. 38 degrees and rising

C. 40 degrees and rising

D. 42 degrees and rising

500

Which warranty covers major structural defects?

A. 1-year

B. 2-year

C. 5-year

D. 10-year