Blow a Fuse
Materials Maddness
Cats
Call a Spade a Spade
Once Removed
100
This section of the standard specification describes the general requirements for electrical work.

What is section 651?


651

100
This role should coordinate contractor materials related activities.

What is the CPMC?


CMM 8-10.1.2

100

This category includes Truck & Trailer Mounted Attenuator of the Work Zone Traffic Control Devices Approved List.

100

The authorized representative of the engineer assigned to inspect the work or materials. 

What is an inspector?


Page 6 of Standard Specifications.

100

Symmetrically trim lower limbs or branches of trees left in place and overhanging the roadbed to at least this height above the finished grade. 

What is 20 feet?


201.3(6)

200
This label must be on all electrical conduit and fittings.

What is UL or NRTL?


652.2.1

200
This website contains all material related data for a project.
200

This segment of category of IRI Ride is asphalt pavement with a single opportunity to achieve a smooth ride.

What is HMA II?


440.3.4.2(4)

200

Modification of soils or aggregates by incorporating materials that will increase load bearing capacity, firmness, and resistance to weathering or displacement. 

What is Stabilization?


Page 8 of Standard Specification. 

200
Roadside clearing can be measured by the station, by the square yard, and this unit of measurement.
What is by the Acre?


202.5

300
This must be stamped on communications pull box covers.

What is "WISDOT ITS"


652.3(1)

300
This provision requires the contractor to use steel and iron products manufactured in the United States.

What is the Buy America Provision?


CMM 2-28.5


300

This category includes Drums, Channelizers, Flexible Tubular Markers, and Traffic Channelizing Curb System of the Work Zone Traffic Control Devices Approved List.

300

The designated physical area together with improvements to be constructed under the contract. 

What is Project?


Page 7 of Standard Specifications.  

300

Under this bid item, the contractor must remove non-rectangular culverts with a crosssectional area equivalent to or larger than the area of a 12-inch diameter round pipe but smaller than a 60-inch diameter round pipe. 


What is removing small pipe culverts?


205.5.2(1)

400
Bolts must be tightened conforming to this department form.

What is the DT2322?


657.3.3.2.3(4)

400
This report, titled Miscellaneous Materials, are used to report activities that aren't covered by other standard prefix-numbered reports.

What is 155?


CMM 8-45.5

400

This category includes box culverts, wall panels, and temporary barriers of the concrete pipe and precast products approved list.

400

A highway with separate roadways for traffic in opposite directions. 

What is divided highway?


Page 5 of Standard Specializations.  

400

The department will make none of these from the volume measured under the Excavation bid items for pavement removed under the Removing  pavement bid item. 


What are deductions?


204.4(4)

500
Traffic signal faces include signal housing, backplates, and this type of module. 

What is LED?


658.2(2)

500

Upon completion of the project, this form must be submitted stating that all steel, iron, and conating processes for steel or iron incorporated into the project follow "Buy America" Provisions.

What is WS4567?


Buy America Provision

500

Design the highmast pole and its connections to this AASHTO fatigue Category Criteria.

What is Category 1?


660.3.1(3)

500

The portion of the roadway for the movement of vehicles, exclusive of shoulders and auxiliary lanes.  

What is Traveled Way?


Page 9 of Standards Specifications.  

500
The department will pay this many times the contract bid price of the Excavation Common bid item to remove boulders having a volume of 1 CY or greater if the Excavation Rock item is not included.

What is 5x?


205.5.2(3)