That it is the indicator of ring for the panels of bardage
Which is the press of a statement
in what condition can we seal on a concrete terrace
when the shell is finished
That it is the DTU for the waterproofness on tub(ferry,high school diploma) steel
That it is the difference between a simple bardage or doubles skin
Double skins two layers of cladding and insulating material in the middle
How much fire extinguisher needs he by blowtorch
what is the use of sopradere
facilitates soldering
On what is put lanterns
On the skeleton
By or begin the pose on a cladding vertical line
from below
In membrane PVC how much there is t he of coat
Has what moment we are dry
After the pose of adorn vapor
In which smell settles ideally a tub
Perpendicularly in set her
Which is the slope minimum for a couvertine
From that she(it) thickness of insulating material owes have to put a set square of 33cm
How much has to support(bear) the paving stone concrete in m2 for a vegetable roof
How have basic salary a costière
In staggered rows and everything them 300
How if call panels of bardage already isolated
sandwich panel
That they are the losses has to take into account on the pose of roller
Stripe(Braid) and covering
what is the slope to respect for an overflow
what is the maximum area to collect by an ep