What is high or 10?
The equation for the Control Limits
What is 3 Sigma above/below the mean?
The movement of people
What is motion?
The neighbors criticize, impugn, question my cotton oak tree.
What is Fault-Tree?
The head of the Fishbone
What is the project Y?
The RPN equation
What is Severity * Occurrence * Detection?
The first analysis step if one has out of control point(s)
What is determine Common/Special cause?
Idle time
What is waiting?
Reading English and Cause Maps read this way
What is Left to Right?
The Fishbone and C&E Matrix have this purpose in common
The number of Failure modes a belt should address.
What is exhaust or all?
The Control Chart with subgroups >8
What is Xbar-S?
Does not conform to customer needs
What is defects?
The number of Q&A's in the 5 Why tool
What is at least 5?
The alignment of this C&E matrix attribute and your project Y defect
What is the weightiest attribute?
The purpose of the FMEA
What is filtering to KPIVs and creating remediation actions
The Control Chart for M&M MSA activity
What is U Chart - (Defects per unit)
Named after me
Who is TIMI WOOD?
The three causal analysis tools taught
What is 5 Why, Cause Mapping, Fault-Tree?
The correlation score given to the type of measuring spoon and time to make a donut.
What is zero?
What DMAIC phase is FMEA used?
What is Analyze then Improve?
The purpose of a Control Chart
What is evaluate process performance over time.
The worst type of waste
The biggest mistake when conducting causal analysis
What is the Answer not addressing the Question?
First best choice if C&E matrix has little differentiation in its' output
What attribute/characteristic is missing?