NAVFAC Org
FMD
Services
FEAD
Other
100

A forward-deployed element FEC that provides a full-range of NAVFAC facility and environmental products and services to installations.

What is the PWD?

100

DON electronic RPI system.

What is iNFADS?

100

Developed in conjunction with the preparation of the Performance Work Statement (PWS).

What is the Performance Assessment Plan?

100

Maximum number of workdays in a calendar year that an alternate quality control manager (QCM) can be designated to take the place of the QCM.

What is 30 calendar days?

100

If the correct execution entity is NOT determinable from the NAVFAC Products and Services (P&S) Matrix, the work is routed to.

What is the Work Induction Board (WIB)?

200

Single authority for all Marine Corps installations.

What is Marine Corps Installations Command (MCICOM)?

200

Branch of the Public Works Department is responsible for implementing the Encroachment Action Plan (EAP).

What is the Asset Management Branch?

200

Conducts performance assessments and completes the Performance Assessment Worksheet (PAW).

Who is the PAR?

200

The Post Award Kick-Off (PAK) meeting is held

When is after award but before work begins?

200
Comprehensive NAVFAC resource that provides information on the full range of systems and services.

What is the BMS?

300

FEADs are composed of the following branches.

What are PME, Contracting (formerly Acquisition), and FSC.

300

Approval Authority for standard Site approval Requests.

Who is the ICO?

300

Information at this meeting is used by the FSCM when completing the CPARS evaluation.

What is the Performance Assessment Board?

300

A Request for Information (RFI) is submitted

When the contractor seeks specific knowledge from the Government

300

Federal Awardee Performance and Integrity Information System (FAPIIS) protects information entered into the system by

What is encryption?

400

The Budget Sumbitting Office (BSO) for Navy Installations.

What is CNIC?

400

The process that develops comprehensive, long-range, and strategic plans for specific geographic areas.

What is the Regional Integration Plan (RIP)?

400

Service request type automatically approved

What is Emergency?

400

Formal partnering meetings are facilitated by

Who is professional facilitator/third-party?

400

Information specific to the item being acquired and determining whether the Government’s needs can be met by items that are customarily available in the commercial marketplace.

What is Market Research?
500

Provides Systems Command (SYSCOM) support to all warfare and provider enterprises.

What is NAVFAC?

500

Ensures accurate, timely, and complete data related to facilities planning and management of real property at their respective Public Works Department.

Who is the Real Property Accountability Officer (RPAO)?

500

A comprehensive program document that lists all Regional facility support performance requirements and maps them to FSCs.

What is a Regional Acquisition Strategic Plan (RASP)?

500

During an Occupational Safety and Health Assessment (OSHA) site visit, Facilities Engineering and Acquisition Division (FEAD) personnel

assist the compliance officer in any manner necessary

500

Program or organization holds the primary responsibility of preparing DoD installations during emergencies to protect personnel, to save lives, and to recover and restore operations afterwards.

What is the Installation Emergency Management Program?