Where's Lunch
Lunch is Late
Keep Starving
Wingin It
I have room for more wings
100

What is the priority for a CM that's 80% staged ?

24

100

What is the max location for partials

4000

100

What are S2 cuts & who can make that decision & why ?

S2 cuts are BCP cuts that can be only approved by the SNO leader  or the site leader (B4) when the site is loading behind.

100

What are the 4 pilots roles ? Describe 

1. Allocation : Release work
2. Inbound : Provide door and lane for inbound
3. Outbound : Provide door and lane for outbound
4. Shorts : Fulfill product shortage needed for CM

100

How far ahead should short pilot be fulfilling shorts ?

24 hours

200

Which is the highest priority ? 46 or 4 ?

4

200

Name 3 types of pallets that might be in pallet hospital ?

Pallets that are not zoned, lost pallets, tall pallets

200

How early can a planner cut a full pallet ?

For full pallets, they can get cut 6 hours before ESD

200

What is 2 step allocation ? Describe

1. Allocate first less than load level
2. Release remaining full pallets once there's an available staging lane/trailer

200

What happens if a short cant be fulfill and there are 3 cases remaining to close the CM ?

Cut it

300

How early should MSO work be released ?

Work for MSO is released up to 3 days before Scheduled Begin Date

300

Definition of Merge lot codes

Ability to mix 2 codes in a pickface

300

What are the assumptions used during the capacity meeting ?

Productivity rates, attendance, and warehouse assumption

300

What are the 2 main centerlines for allocation pilot ? (in terms of ESD)

1. Keep CP/LP allocation 12 hours out

2. Full pallet allocation 8 hours

300

Who can cancel picks ?

Cancelling picks can be done via technician, pilot, or the system (PrIME).

400

True or False ?
TCC assigns & check ins trailers 

FALSE

400

What are the 6 main sources of partials ?

Receipts, Damage, MSO, Unslotting, Returns, Inventory

400

When can Planners can cut less than full pallet loads ? 

 if :

    1) No inventory is available in the warehouse

      2) No inbounds on the lot with that inventory

400

Explain how the inbound pilot pick which inbounds to unload in order ?

1. Inbounds needed for shorts
2. Inbounds sitting on the lot for 24 + hours
3. Others

400

Whats a count audit and who conducts it ?

•The countback auditor gets notified by the system through directed work. They count what’s on the pallet vs the location. Once the auditor is done, It releases that location, picker finishes to pick it, and  can now move on to their next location.

500

What is the vehicle type for yard drivers ?

Yard

500

What are the 2 methods of processing damages ?

Inline moves & Full Inventory moves

500

How early can planners cut less than full pallet loads ?

can cut 24 hours before the ESD

500

What are top4  reasons for shorts ?

Not in allocation search path
Inventory status
Location flag Asset type
Decimal quantity


500

What is APAL ? What does it mean to have a positive APAL score vs a negative one ?

APAL is the system that builds set ups/trucks based on customers needs.

PrIME provides information to APAL so APAL can build the pallets