QS Manager
TP Manager
NPTG
Odds & Ends
CCD(A)
100

What CFITES phase is used to make a QS

Analysis

100

TP is the output of the Development Phase

False, Design Phase

100

TM maintains two docs

QS, JTAR

100

CFITES stands for

Canadian Forces Individual Training & Education System 

100

CCD stands for

Curriculum Control Documentation

200

What 3 parts make up a Performance Objective 

Performance statement, Conditions,Standard, 

200

A EO Statement  and Teaching Points describes the?

Lesson Specfications

200

Is Training in a TE the only option to address a performance gap

No, equipment, outside support

200

How many CFITES phases

six

200

What documents are controlled?

QSP, Lesson Plans & Guidence, Assesments

300

Who owns the QS in the navy

CNPTG

300

Who owns the TP in the Navy

NTDC CO

300

A NA is the result of?

Strategic Guidance, Operations

300

Name the 3 Components of CFITES

Quantity, Quality, Resource Mgmt

300

Another name for a CCD Analyst is ?

Instructional Designer

400

Name the QS assessment instrument

Performance Check

400

Does every EO require its own EC

No,can be tested with another EO

400

NTDC(A) combines the TP with the Lesson Plan

True, referred to as Lesson Guidence

400

What term describes never ending improvement in courseware

Contiuous Improvement

400

BOSN Curriculum refers to what?

 All BOSN QSPs and courseware within their MES


500

A Qualification Standard describes what

Job Performance

500

Does a EO enable the learner to do what?

Achieve the Performance Statement or requirement

500

Where do I look for CCD Development work

Development Schedule (DevSked)

500

Name the six Quality Control phases 

Analysis, Design, Develop, Deliver, Evaluate, Validate

500

Who is the Training Authority for the RCN

CNPTG