Scheduling & Quoting
Registrations, Submissions & Certificates
Change Notices & Special Audits
UAA & Subcontracting
MDR
100

Form used by TUV SUD America sent to utilize subcontractors

What is the Work Agreement Form or MHS_F_03.01?

100

Location for CRT2 submissions

What is MEDICI?

100

Document/form used to find the type of Change Notice that needs to be reviewed

What is the Appendix D?

100

The primary contact in the US for regional subcontracting requests

Who is Ally/Alesandra Forziati?

100

The TPS Number is assigned from this document

What is the iBSC Information Sheet?

200

PTDE (Full name / description)

What is a Project Temporary Direct Employee?

200

The current revision of the Audit Plan as per RoXtra

What is Revision 24?

200

In PSE project setup, the CBW details field site

What is the site affected by the Change notice?

200

"Product field" type of audit that is used to categorize regional subcontracted projects

What is Special Audit?

200

NaLE stands for

What is National Legal Entity?

300

The tool used to send out quotations to clients

What is the Applications Console?

300

The UCB Process Lead of Certifications

Who is Brittany Provost?

300

Used as the "PSE Model" instead when an application does not have an Application ID number

What is the date of the application was signed by the client?

300

Listed under the PO section for UAA in project info

What is, As Per Contract?

300

A direct contract between PS GmBH and the customer for MDR/IVDR Conformity Assessment projects

What FWA (Framework Agreement)?

400

EAC is to MDT, as MDA/MDN is to

What are NBOG codes (MD Codes)?

400

The date TUV SUD stopped issuing MDD and AIMDD certificates

What is May 26th, 2021?

400

4 types of review processing for Change Notifications

What is to be handled at next audit, TD Review, Special Audit, TD Review w/ Special Audit?

400

The three required documents for an UAA submission

What are, the Company Profile, Assessment Plan, Confidential Audit Report?

400

No later than 6 months after the Stage 2 audit, this must be completed

What is the TD Review?

500

MED_W_06.16

What is the work instruction for Audit Planning?

500

Submission type for MEDICI to add or remove an NBOG code from a client’s profile in CBW

What is a Change of CBW Metadata?

500

6 scenarios for when a Contract Review is needed for UCB

What is Initial Audit, Upgrade in standard, Scope change affecting codes, New to UCB, New facility for MDSAP, Upgrade to MDSAP?

500

The QUANTITY and GRADE of non-conformances that triggers a mandatory MDSAP UAA (Hint there are 2 grades)

What is, one or more grade 5 OR more than two grade 4?

500

The application in which we would locate the MDR codes

What is Appendix A?