PTC Initial Terminal
PTC Enroute
Rule Updates
Process/Office Notice Updates
Rules Violations/DTE/FAQ
100

Trains must have this prior to departing initial terminal

What is Operative PTC?

100

These 3 things required during the job briefing when using the ATP (Authority to Pass)

What is inform the crew authority has been sent, route and direction train will traverse?

100

This type of train must hold the main track when practical, unless a speed of greater than 10mph is authorized for the siding or auxiliary track

What is a Key Train?

100

A Dispatcher must confirm these two things with a foreign train if operating on a TIH/PIH prohibited subdivision

What is key train status and if they have any loaded or empty TIH/PIH cars?

100
These are the steps a Dispatcher must follow when they receive a report of a trespasser

What is protect the area(includes adjacent tracks), and notify RMCC and CM?

200

This is where you/crews can find out if a leader is operative

What is paperwork/=LI?

200

These 3 things are required during the job briefing when using the EMT (Enter Main Track)

What is inform the crew the authority has been sent, track to be occupied, and direction of travel?

200

This is required if a train defect detector is put back in service and was initially protected by track bulletin or included in TCS

What is a PTT for 14 hours after the detector is back in service?

200

When requested to run a TIH/PIH (loaded or residue empty) car on a prohibited subdivision the dispatcher must have these two things

What is Network Supt approval and a form c?

200

This is the main difference when you receive a tie fire versus a right of way fire

What is stop the last train through if its a right of way fire?

300

Where you go to find the most current PTC process for Dispatchers

What is Dispatcher Standard Process/Electronic Rules, Bulletins, and Timetables or GO/ERT?

300

When issuing the EMT you must select this CP first in order for the direction to display correctly

What is the CP behind the trains direction of intended travel?

300

The Dispatcher must follow these steps when they observe a train or on-track equipment leaving TWO separate track occupancies closely behind their movement

What is Stop the movement, notify the crew that multiple occupancies were left behind the train, instruct them to conduct a roll by, and notify SOC and CM?
300

The Dispatcher must submit an exemption request for TPA,FCS/EMS exemptions and provide the crew this

What is a control number from the Network Supt/higher authority?

300

This car width/swing out is the minimum width that requires protection due to being excessive dimension

What is 12' 1"?

400

The Dispatcher must complete this if PTC cannot initilize

What is a MDR?

400

These steps must be followed when PTC and the signal in the field do not match

What is ensure train is within 1500ft of the signal, enter the ATP, ask if the next target changed (Yes issue ATP, No cut out to pull past signal), and finally submit MDR stating if ATP worked or not.

400
This is the key difference when flagging between a manual interlocking and a z-manual interlocking

What is a z-manual can flag after working the release box without communicating with the opposing railroad (if equipped)?

400

When not auto-generated, the Dispatcher must do this immediately after issuing an excessive dimension bulletin

What is have the CM audit for any errors?

400

List the tools available to a Dispatcher to assist with PTT placement

What is E-Track Profile, Track Profile Search, Track Network Map, Z/X Function on the track bulletin menu in CAD, MCTD, and last resort Timetable?

500

Wait times for UPS/Metra, Passenger trains, and all other trains(in order).

What is NO wait time (UPS/Metra), 10 min (Passenger), and 15 min (all other)?

500

Besides when the PTC Help Desk states so or the timer has expired, these are the only other times a Dispatcher can authorize a train to soft cut out PTC

What is if the next target doesn't change after entering a ATP or during an emergency (injury, property damage, or jeopardize safety)

500

Before issuing a TW electronically, the Dispatcher must do these two things

What is confirm the limits and verify the limits will protect the train?

500
List the steps a Dispatcher must follow once notified of a hot wheel alarm

What is 1. provide car # (if available) 2. instruct the crew to comply with SSI Item 13.1K 3. determine the location of the next hot wheel.

500

The Dispatcher must use this function after a train has traversed a step-up in CTC only

What is the "G" function? Reminder: this is only in CTC follow all of the prompts in TWC as before.