Draw Setup
Draw Process
Draw Transactions
MISC Construction
MISC Construction 2
100

The Charge Code used for Draws should be this type of GL Account

Liability

100

The Draw Job and this, are a unique combination that cannot be used more than once in the system

Draw Date

100

When using the Charge/Receipt functionality for Draws, whom is the Charge against?

Funding Entity(s)

100

The main GL Account that tracks all of the cost activity for Construction

Work in Progress or Construction in Progress

100

If a contract amount needs to be increased or decreased, what would you use?

Contract Change Order

200

The amount of ways one can setup a Funding Source

Three (Manual, % Allocation, and Tiered)

200

There are three main types of draws: Charge From Costs, Manual, and _______ __________

Percent Complete

200

If not using Charges and Receipts to record the money received from the draw request, what transaction can be used instead?

Journal Entry

200

Which type of client (GC or Developer) would you expect to see A LOT of separate contracts per trade?

General Contractor 

200

There are three types of Budget Revisions: Scope Change, Budget Transfer, and __________

Contingency

300

A funding source is normally setup as this object type in Voyager

Customer

300

This is the most commonly used type of draw process used

Charge From Costs

300
By default, which transactions are Draws bringing in to the worksheet?

Payables

300

There are three main objects that the system will look for a WIP account: The Job, Category, and ___ ____

Job Type

300

This type of transaction will populate your Job Cost Subledger, but will not affect the General Ledger

Job Cost Adjustment (JCA)

400

In order for Draws to be numbered sequentially by job, this must be loaded into the system

Optional Package

400

Changing the Draw Worksheet to this status will lock down the worksheet from modifications

Submitted

400

If a client wants to remove transactions on a Draw, which screen can they do this on?

Draw Manager

400

Where in Job Cost can a client hide/unhide fields, change field descriptions, and update which fields are required?

Page Configuration

400

When coding payables to a contract, a user should always use this button on the invoice screen.

Load Contract

500

Where would you find the "Auto Load Budgets" check box?

Construction Accounts & Options

500
The last draw process

Receive from Billing

500

A client deleted charges and receipts on a draw, but they are still appearing on the draw worksheet. Use this function to fix the worksheet.

Recalc Draw Charged/Received

500

This is the act of holding back a percentage of invoice costs to be released at a later date depending upon the contract

Retention

500

These job status allow transactions to be posted against the job: Approved, Completed, In-Progress, and _________

Scheduled