The 3rd step of the Innovator's Method
What is nail the solution?
A process used for creative problem solving
What is Design thinking?
To help prevent the work from slowing down due to collaboration this activity is performed.
What is by refining the communication and evaluation processes?
The first step step of systems thinking.
What is Observe the Real World?
The total number agile principles.
What is 12?
In a Psychological safe space, people need to be comfortable with __________.
What is Failure?
The steps in the design thinking phase.
What are Empathize, Define, Ideate, Prototype, Test & Refine?
This action should be taken if conflicting opinions arise.
What is assign a final decision maker at the start of the project?
The Iceberg Method look at _______________.
What is what might be below the surface?
Scrum, extreme program and Kanban are examples of _______________________.
What are some types of agile methodologies?
The last step of the Innovators method
What is a business model?
The elements of the design thinking process.
What are people, technology and business needs?
Collaboration generally lead to more robust solutions because collaboration builds upon _________of __________.
What is a diversity of perspectives?
Emergent systems need to be __________ and _________.
What is Complex and holistic?
MVP stand for this.
What is Minimum Viable Product?
A benefit and challenge for collaboration
What is speed?
The last phase of design thinking
What is Test and Refine phase?
Ensure all team team members understand and align on collective goals for the project.
What is a best practice for collaboration in the workplace?
The Systems Thinking tool that can help us improve the alignment between our thinking and what reality actually is called ____________.
What is the Systems Thinking Feedback Loop?
A characteristic of a lean startup organization is Employees are empowered to be ____________.
What is curious?
A human-centered approach to innovation that integrates the needs of people, the possibilities of technology and the requirements of the business into one process.
What is Design thinking?
When starting a project, norms for team interaction should be _________ and ________.
Simple and conservative
RACI stand for this.
What is Responsible, Accountable, consulted, Informed?
The tool allows you to make constant adjustments in real time.
What is Build-Measure-Learn Loop?