Terminology
Maintenance
Load/Unload
Description
100

AC PDU

What is Alternating Current Power Distribution Unit

100

How much does a launcher weigh?

What is 43,000 lbs

100

Where do you place the R/S and C/S chock blocks when chocking the HEMITT? 

C/S: place one chock in front of wheel on number two axle and one behind wheel on number one axle.

R/S: place one chock behind wheel on number two axle and one in front of wheel on number one axle.

100

Enables 24VDC power to the truck electrical system

What is 24 V BATTERY DISCONNECT Switch

200

LCCU PS

What is Launch Control Computer Unit Power Supply

200

The THAAD missile round contains what kind of explosive?

What is Class 1.3 explosive

200

Approved hearing protection must be worn when working within a BLANK radius of the Launcher

16 ft (4.9 m)

200

Used to raise and lower the MRP-T. These operate with the engine at low idle until the deck reaches 10 degrees, then goes to high idle

What is Deck Erection Cylinders

300

ADUIL-JB

What is Azimuth Determination Unit Interlock Junction Box

300

After you locate the A2/A3, Circuit Card Assembly (CCA) within the Launcher Computer Control Unit (LCCU) A2/A3 slot


What is the next step?

What is Locate faulty V Hard Drive Assembly, on top of A2/A3 CCA

300

Where is W414 and what does it do?

What is J2 Connector, and It is the main umbilical between the MRP-T and the Launcher. Also provides composite interlock data for processing by the VIM

300

Used to power the ground rod driver, to engage and disengage the MRP-T rack locks, and to control deck erection cylinders for raising and lowering the MRP-T

What is MRP-T Hydraulic Controls

400

DAGR

What is Defense Advanced Global Positioning System (GPS) Receiver

400

After you locate the CCA within the LCCU A4 slot


What is the next step?


What is Loosen the top, then bottom, wedge lock screws one full turn

400

A minimum of BLANK of firm level terrain is required for MRP-T unload

What is 100 ft (30.48 m)

400

Allows for 24VDC auxiliary power connection for starting the generator

What is SLAVE RECEPTACLE

500

UIA

What is User Interface Assembly

500

After you grasp the handle on the KG-175D, and loosen the bottom screw on the chassis with screwdriver 


What is the next step?

What is Pull the sled from the rack and inspect pins and connectors

500

What piece of equipment weighs more than 42 lbs. (19.05 kgs) and requires a two person lift

What is the Under Run Bumper

500

Used to provide data communication between the Launcher and control centers

What is TFOCA II Connector