100

This level of emergency requires a prompt response and more than 50 customers have lost service

What is level 3? 

Chapter 16, page 13, table 16-2

100

Inspection frequency of pipelines where atmospheric corrosion was found.

What is within 3 years, but not to exceed 39 months?

 chapter 12, page 16

100

Application of tape wrap coatings have this percentage of overlap.

What is 50%?


 page 25, chapter 5, #14

100

Depth service lines should be installed.


What is 12 - 24 inches? 

chapter 8, page 22

100

The ______ _____working with the Engineering and Operations Departments, submits and Incident Report to PHMSA as soon as practical, but no more than 30 days after an incident.

Who is the Vice President? 


Chapter 3, page 4

200

Outage lasting more than _____ ______, must have a written report to PSC and ORS after restoration of service.

What is six hours? 


Chapter 16, page 17

200

Form used to document inspection of uncovered steel pipelines.

What is the Pipeline Inspection Report?


 Chapter 12, page 5

200

After casing is loaded with the carrier pipe, check the two metallic structures to verify _____ _____. If ______ ______ is not obtained, then take actions to provide appropriate corrosion protection.

What is electrical isolation? 


Chapter 5, page 20, #8

200

This is the minimum test pressure for each newly installed meter manufactured after November 12, 1970

What is 10 psig? 

8.7.2 Installation , page 21, (12)

200

Test each service line temporarily disconnected from the main from the point of disconnection to the service line valve in the same manner as a new service line before reconnecting.

What is Test Requirement for Reinstating Service Lines?

 6.1 Test Requirements for Reinstating Service Lines, page 4

300

An operations center staffed by personnel charged with the responsibility for remotely monitoring and controlling a pipeline facility.

What is a control room? 


Appendix E (chapter 21)

300

These two months are designated for conducting aerial patrols of transmission and high pressure pipelines.

When is February and September? 


Chapter 10,  page 5,Table 10-1

300

Strength test requirements for mains and services require ____ psig or 1.5 times the MAOP, whichever is greater.


What is 90 psig? 

chapter 4, page 42

300

Steel pipelines that operate at elevated pressure above 60 psig will have this percentage of welds x-ray tested.

what is 15-25% of welds?

Chapter 8, page 5.

300

Emergency or incident when it can affect life or property if the Authority does not promptly resolve the condition.

Safety-related condition?

 chapter 3, page 5/6

400

In regards to emergency response training, the Authority must confirm in writing that the OM&E manual has been reviewed no later than this day each year

When is August 31st? 


Chapter 16, part 6, page 29

400

YCNGA normal operating pressure for high-pressure distribution lines.

What is 175 - 250 psi?

Chapter 1, page 3

400

The Authority prefers joining by welding or heat fusion and must only use mechanical couplings in this condition.

What is an Emergency? 

Chapter 5, page 19, (g)

400

This is not required if a service line does not operate at a pressure of 10 psi or greater throughout the year.

What is an Excess Flow Valve (EFV)? 

chapter 8, page 28 (4)

400

These regulator locations are inspected _____ a year and relief valves ____ a year not to exceed 15 months.

What is twice and once?

Chapter 6, page 5

500

Upon declaration of a disaster or confirmed cyber related  incident, evoking this plan will be required.

What is the Disaster Recovery Plan? 


Chapter 16, page 16, IT evokes plan

500

The specific gravity of natural gas is ____ and the flammable range is approximately ___ to ____ in air.

What is .06 and 5% to 15%?


Chapter 10, page 9, 10.2.1

500

Maintain this depth when boring.

what is 30 - 54 inches? 


Chapter  5, page 15, #5

500

A pipeline that is coal tar wrapped must follow this when making a replacement and/or repair.

What is the asbestos-containing material (ACM) procedure? 

chapter 7, page 8 / OSHA Standard is 1910.1001

500

NPMS

What is the National Pipeline Mapping System?

Chapter 3, page 8