Hanger Spacing
pex
32"
3" abs
1/4" every foot
S stands for
minimum toilet drain size
3"
straight run of 4" or less
50ft
3" abs
also every 4ft
4" abs
1/8" every foot
L stabds for
leak
minimum lav drain size
2.5"
what degree turn needs cleanout
greater than 45 degrees
2" copper
10ft intervals
2" copper
0" per foot
A stands for
aspiration
minimum laundry
2"
a clean out should be provided at or ____ the base
near
1" copper
every 6 ft
5" PVC
1/8" per foot
M stands for
momentum
Minimum underground
2"
Cleanouts should always be ___
accesible
Threaded pipe
every 12ft
free points
yaaaaaaay
O or B or E or C stands for
oscillation or back pressure or evapration or capillary ation.
minimum floor drain
4"
cleanout should not be more than ____ beond the foundation wall
5ft