Draft
01-Creation
what is the 1st process step in Phenix?
utilized to communicate the scope of the change for
endorsement and draft the Change Control to be entered in
Phenix.
what is CCST?
-CCST
-Phenix pdf.
- "go"
what are the GEODE prescreening steps?
Draft the change control, obtain endorsement, and approval.
Implement an endorsed and approved change control
Who is PL?
Status 10
when CCR is ready to implement in the system?
-"No-go" decision in GEODE from assessor
- CM kicks back to 0.1bis after system owner approves
- When change cannot move forward without further info?
-Defines scope
-gets endorsement
-Collects input and updates CCST
Whats PLs role screening CCST?
-Available to download in GEODE
- Saves annotated comments for phenix files
What is Adobe DS used for?
- Supports the PL in gathering all required info. for draft CCR
- Approves or rejects CCR
- Participates in the CCR screening process
Who is System owner?
# indicating row/finished product impacted
what is GALY Code?
-Decommissioning
-Qualification of lab instruments
-Create stability PRT.
What change type does not require CCR?
Section 2 Input
-Current situation
what describes the current status of the system where the proposed change will occur?
-select -COM title
-language
- performers
what is properties?
- Contributes to Risk assessment
- Review CCR
-Identify works required to implement the change
Who is SME?
-Status 4
-assessments from mandatory assessors
(RA/QA)
when change is moved to status 04 ?