ITP
BRIEF
DESIGN
TECH DEV
MISC
100

This team responsible for the Brief section of ITP

Who is the PM.  (PLM or Marketing also acceptable answers)


100

Target Consumer, Product Priorities and Goals are part of what section of the ITP

What is the Brief

100

These views- Lateral/Medial/Top Down, Heel and Toe are provided by which function

Who is Design

100

Which functions are included in Pre-ITP discussion

Design, PM, TD, Engineering, Margin Planning, Testing

100

Why Is Creating a Project Plan and Wear-Test plan at ITP important


To communicate clear expectations and deliverables to the Project Team

200

Which tool is used to engage the team early and level set on Costing expectations

What is the Early Cost Engagement tool

200

This function provides Model Strategy (Positioning/Marketplace), Intro Date, Distribution, Life Cycle & Color Strategy 

Who is Merch

200

What information is required for all Logo's on Upper and Tool

What is Dimensions/Measurements

200

How many days after ITP handoff does TD typically have to communicate to Factory partner

What is 7 days

200

When sharing with the PCC, what is the system of record for all Design files, Sample Requests and Project Documents

What is PCX.  BOX can be the second record of files/documents

300

These are the top 4 attributes that define ITP

Brief, Design details, Material information, Target Value

300

What 3 key pieces of information would our PM partners provide

Consumer, Product Positioning (classics/remastered or Modern/future), Priorities/Opportunities (the why)

300

When would you need a cross-section for a Logo

When you have a molded component/logo

300

What should be the follow up action item after ITP is sent to factory

Scheduled VC with Factory partner and WHQ project team

300

What is the Value Index Breakdown

Target Material
Target Standard Minutes
Tool Budget

400

What are the action item deliverables coming out of ITP handoff to our Factory partners

VC with Team. (ALL WHQ/ASIA PROJECT TEAM SHOULD PARTICIPATE)
Aligned Project Plan to first gate with Factory
Pattern Trial/Tool file ETC

400

What are the 3 F's under product priorities in the Brief

Form, Fit & Feel

400

Is it OK to send as an image of a graphic on the CAD for graphic schematics

No.  Graphic Schematics are required for proportional details

400

These are the key Project Team functions

Design, PLM, TD, Engineering, Testing, Margin Planning, Material Design, Material Development, Merch

400

Design should provide the following details when sending Upper information

Shell pattern, Color/Material CAD with multiple views, Cross-Sections for molded components, and a Blank CAD for you to create Component Call-Out sheet 

500

What is used to kick off communication and partnership with the factory providing clear project details and deliverables

What is the ITP

500

What are the different Development Tracks in a season and why would you use them.

XLT, LT & BT
XLT- High Complexity models
LT- Requires early testing
BT- New creation

500

You should always provide the factory with a minimum of ____ Cross-Sections for tooling

what is 4

500

These Tech Difficulty codes require an ITP 

What are- N4, N3, N2, N1, V2, and V1

(All N and V level)

500

Design should provide the following details for a project with New Tooling

2D PDF Files: Lateral, Medial, Toe, Heel Bottom, A-A views with minimum of 3 cross sections.
*Bonus M/S & O/S compounds
**Bonus Texture map