Closing
Contract
Scattered
Company/ Process
100

What are the ONLY 4 objections?

Price

Timing

3rd Party

I dont like the product

100

Notes for building a full wall

Long Baths will build a full wall on the left to create a new alcove measuring roughly.... the reverse side of the newly built wall will be left unfinished per customer request.

100

How many selling days are there in a month? 

(on average)

25 (26 acceptable) 

100

How many years has Long Home Products been in business?

29 years

200

What does the acronym S.A.L.E.S stand for?

Silence

Affirm

Layer

Eliminate

Solve

200

You sold a job last Thursday (10/5) in MD over 65 yrs old, when is the last day of RTC?

10/14

200

Does Delta or Moen have an ADA compliant slide bar?

Delta

200

How do you know that your time off request has been approved?

Calendar invite

300

What is the hardest objection to overcome? 

The one you dont know.

300

What are the notes required for a flat shower floor?

bathroom location

match or change existing

drain location

color of base

color of threshold

300

What are the custom fees required for EVERY cali shower?

Cali fee

Custom bend on site

300

To the nearest 1,000, how many GQs does our presentation say we have?

11,000

400

What are the 5 steps to a managers call?

Say something to draw them in

Why we are here

What have you selected - why?

pricing/ discount break down

if I could, would you statement

400

What is the maximum height and width a custom Leser door can be? (not including the base)

height - 84"

width - 72"

400

What 2 scenarios is a ceiling panel required?

If their current walls go to the ceiling.

If they have a textured ceiling (or tiled).

400

What does MHIC stand for?

Maryland Home Improvement Commission

500

Deliver 365 day price the way we scripted it 

(rebate close)

Here at long we have a fully transparent pricing policy which means any kind of offers or promotions we currently are running, whether you know about them or not, it is my job to walk you through them and show you how they work. With that being said, our pricing is based off of time frames. Now I know we advertise to give an estimate that is good for an ENTIRE year, but keep in mind we HAVE to build inflation into that price because the cost for labor and materials is CONSTANTLY going up (33% in the past 2 years). But if you were to wait an ENTIRE year before starting this project your total investment would be……

500

Name all the pictures required for a contract

top left          ceiling under unit

bottom left     water shut off

top right         draw it out

bottom right    tape pics for A/B/J/H

step back

500

When was the first Bath lead ran?

September 2019

500

List price = $22,567

You sold at PCP with 1/3 down on a CC, customer is financing the rest. What is the CC fee?

$150.45