Paper work
5s
Opex
GD and T
Bad Part Procedure
100

Used to insure that all parts can be identified with there production number and material number

What is a route card?

100

S1

What is never Search

100

Transportation and movement

What is a type of waste?

100

symbolic language on engineering drawings that describes nominal geometry and its allowable variation.

What is GD and T

100

First step of bad part procedure.

What is stop the machine?

200

Paper work that is used to help make the part. This includes tolerances and GD and T symbols.

What is a blueprint?

200

Never worse again

What is S5

200

Leadership

What is a success factor?

200

GD and T symbol Ø

What is a Diameter?

200

2 numbers need to make an adjustment

Nominal and measurement

300

Paper work that is red and tell all that these parts are not to be further processed unless approved by quality or engineering.

What is a block tag?

300

What is the purpose of 5s at Hirschvogel

What is organization and cleaning?
300

1938

What is the year Hirschvogel started?

300

GD and T symbol Ɍ

What is radius?

300

Begins the need for a bad part procedure

What is a Bad measurement

400

9 digit number at the top left corner of a route card

What is a production number

400

KISS

What is keep it simple stupid

400

Customer-oriented and stable processes

Flow production in alignment with customer takt time

Self-regulating and consumption based processes

What are the 3 principles of the ideal plant?

400

Measurement that takes an average of the surface roughness

What is Ra

400

Final step of bad part procedure

What is run if good measurement and go back to step 4 if it is a bad measurement

500

2 digit number after the material number

What is a revision number?

500

Clear and visible responsibilities 

What is S3

500

searching and waiting and tranportation and movement are just a few of theses

What are the 9 types of waste?

500

Is the condition of a surface, axis or line, which is 90 deg from the datum plan or datum axis

What is perpendicularity?

500
19.034 +/- .25


.025 is...

What is the tolerance?