This is the definition of Inflation
An economy-wide increase in the average price level
This is the Milestone conducted prior to the EMD Phase
What is Milestone B?
SEWIP
Surface Electronic Warfare Improvement Program
This is the type of dollar provided in Task Planning Sheets (TPSs)
TY$
This effort is commonly de-scoped from EMD contracts in order to meet cost and schedule objectives/thresholds
What are EDM quantities?
EDM
Engineering Development Model
This is the type of dollar shown in Program Funding (Spruill) Charts
TY$
This is when O&S begins
What is upon the fielding of the first system(s)?
OEM
Original Equipment Manufacturer
These are the appropriations of funding that are utilized during the O&S phase
What are PO OMN, Fleet OMN, MPN, OPN
This is the event that has shifted that has ultimately caused the SEWIP Block 3 FRP DR to shift to the right
What is IOT&E?
MCA
Major Capability Acquisition
This is the PPBE phase that occurs 2-3 years prior to FY execution
What is Programming (POM)?
This is the scope on the SEWIP Block 3 EMD contract
What is 1) Preliminary Design, 2) EDM, 3) LRIPs 1 & 2, 4) Engineering Services
DMSMS
Diminishing Manufacturing Sources and Material Shortages