Electrical
Arc Flash
LTT
Electrical Misc
Misc Safety
100

Which of the following is not justification for energized work?

Programing a VFD

Bypassing an ammonia safety device

Scheduling conflicts

Voltage testing and diagnostics

Scheduling conflicts

100

Which of the following information is required to be on an arc flash label?

Nominal system voltage

The Arc Flash Boundary

A method to select PPE (incident energy or arc flash PPE category)

All of the above

All of the Above

100

What does LTT stand for?

Lock Tag and Try

100

What is it called when you plug in a power strip into another power strip into an extension cord?

Piggy Backing 

100

What type of fire extinguisher is required for Electrical fires?

Class C

200

Which class of hard hat is required for electrical work?

Class E

Class G

Class C

Class 00

Class E

200

Solina USA  Foods expectation is that an incident energy analysis is completed by each site.  At what interval must our incident energy analysis be reviewed? 

Every year

Not to exceed 5 years

When OSHA revises electrical safety standards

Every 3 years

Not to exceed 5 years

200

How many locks do you need for 2 energy sources with 6 employees working on that line?

12

200

What Is A GFCI Outlet?

Ground Fault Circuit Interrupter

200

How far away does an employee working on 10,000 volts of power lines?

10 feet 

300

Rubber insulating gloves shall be tested _________? 

At intervals not exceed 5 years

Every 6 months

Class 00 gloves are not required to be tested

Every 3 years

Every 6 months

300

An arc flash risk assessment will determine which of the following:

A: The arc flash boundary

B: The incident energy or arc flash PPE Category

C: Specific safety related work practices to be used before any person is exposed to electrical hazards

D: All of the above

All of the Above 

300

Turning off power switch removes all energy from the source?

True or False

False

300

How Long Do Breaker Panels Last?

A safe brand of Electrical panel that is well-maintained should last between 25-40 years,

300

What book is used for electrical codes?

NFPA 70 

400

Extension cords and 120V electrical power tools must be inspected at what interval?

Before each use on any shift,

At intervals not to exceed 5 years

Annually

As needed

Before each use on any shift,

400

Shock protection PPE (insulated gloves) must be worn when working inside which boundary? 

Limited approach boundary

Restricted approach boundary

Arc Flash protection boundary

Working distance

Restricted approach boundary

400

How many times a year must a LTT procedure be performed?

once a year or if changes are made to the machine in question

400

What is AFCI?

Arc-fault circuit interrupters stop the flow of electricity if they detect a power surge. The action protects your wiring and appliances from permanent damage

400

What is the OSHA standard for electrical?

 

1910.334

500

How long is temporary wiring allowed to be used?

Temporary equals permanent

7 Days

30 Days

Intervals not to exceed 5 years

7 days 

500

Arc Flash Clothing and PPE must be worn when working inside which boundary?

Limited approach boundary

Restricted approach boundary

Arc Flash protection boundary

Working distance

Arc Flash protection boundary

500

How many times does an employee need training and an audit on LTT?

once per year

500

What is (AVR)?

Automatic Voltage regulator

500

How does the human body generate electricity?

Through the body's cells