CSI Divisions
Projects
CGC Trivia
Quality Control
$ MONEY
100

Landscaping

Div 32

100

4 year, 4 phase project

Newport

100

Where is Cornerstone's Cabin Retreat (available for all full time employees) located?

Leavenworth

100
This material will be installed after the building is "weather tight".

GWB/Sheet Rock

100

What does COR stand for

Change Order Request

200

Elevators

Div 14

200

How Many cornerstone Projects are currently in construction phase (including Permit Delayed Projects)

9

200

Chief estimator before Max Anderson

Tom Cole

200

Sequence wise, this item is installed prior to slab on grade concrete.

vapor barrier or cap break or MEP under ground rough in

200

Submitted once a month to the owner.

Pay app, owner billings

300

Fabricated Pre-Engineered Precast Concrete Structures

Div 13

300

CGC's first PT Deck Job

Basis

300

What is the Address for the Main Office

11805 N Creek Pkwy S, Suite #115

300

Name two inspections required for the placement of concrete foundations.

Reinforcement, Placement (Compressive Strength Test), Slump

300

This paper is filled out by sub contractor and signed by CGC for added work.

EWA (Extra Work Ticket)

400

Fall Protection

Div 11

400

First private school

French American School


400

What year was Cornerstone Established

2003

400

This page in the contract documents will advise the contractor of the required special inspections.

Structural General Notes Pages
400

An owner will issue this to change the value of the contract.

Change Order


500

Firestopping

Div 7

500

Largest site acre wise

Bethel

500

Three original founders of CGC

Dave, Fred & Tim

500

Non-Destructive testing method for Complete Joint Penetration Welds

Ultrasonic (UT) Testing

500

What is the AIA Document Number for a Change order

G701