4 things required physically on a satellite accumulation container of hazards waste.
The words "Hazardous Waste"
Start Date of Accumulation
Chemical Contents of the Container
Hazard Communication (GHS pictograms, written words, etc.)
Name 3 of the chemical specific trainings maintained on site.
Acrylonitrile
Methylene Chloride
Hydrogen Sulfide
Isocyanate
Formaldehyde
Methylene Dianiline
Benzene
Members of this Evonik Allentown Functional Group may NOT serve as backup for R&D and Technology operations.
Evonik Allentown Facilities
Active Safe Work Permits posted where in R&D3?
Outside of staging by the dry ice bunker and ice machine.
Bethlehem Steel
Lives on (kinda) as Lehigh Heavy Forge
Waste that is spent or excess material that exhibits no hazardous characteristics but is generated by an industrial or R&D activity.
Residual Waste
2 items required before any personnel work in laboratories.
Completion of New Employee Appendix B
Specific DHR trainings
The 3 areas on campus that function as visitor areas where an escort is not required.
R&D 1 Collaboration Hub
R&D 3 A Wing Ideation Zone
R&D 3 B Wing Town Hall*
What is required upon immediate completion of hot work covered by a safe work permit?
Fire watch for 1 hour
Known for the largest model train convention on the US east coast as well as a peppermint patty coated in dark chocolate, this PA town is a rival to Hershey.
York, PA
Must accompany a satellite accumulation container of hazardous waste
Log sheet or WIMS form
This chemical specific training is for a carcinogenic amine. It discusses the importance of regular skin checks. These checks reference exposure presenting as yellow staining.
Methylene Dianiline (MDA)
The 3 lettered abbreviation for mechanical air handler units that maintain laboratories negative to the office hallways.
LEX (Example: LEX 600 in R&D 1 South)
What does a building evacuation do to all active Safe Work Permits for the same building?
Active Safe Work Permits are suspended.
Andy Dufresne once called Warden Norton this and it got him a long stint in solitary confinement.
Obtuse
The Contaminated Plant Scraps waste stream may not have (blank).
Free flowing liquids and/or solid chemicals.
Contractors must receive site training from Facilities at what time interval?
Yearly
The amount of time after a work-related injury takes place that EH&S must be notified.
As soon as safety permits
Paper Safe Work permits must have these 2 physical characteristics.
Two part, self copying
Uniquely numbered
In Men in Black II, what breed of dog was Frank?
A pug
Name 2 recycling programs the site manages and tracks metrics for.
Nex Trex
K Cycle
KC Right cycle
Lion Glasses
Flavia Packs
This chemical specific training relates to a material stored and used in the R&D 1 building. A smelly material that is an irritant and asphyxiant. This will eventually cause nose blindness as concentrations over 100 ppm.
Hydrogen Sulfide (H2S)
The name of the computer system that monitors safety critical devices for the facility as well as laboratory operations.
Simplex
The person who is authorized in writing to oversee and assist the Contract Coordinator’s efforts. He or she ensures all documentation is in order and that corporate responsibilities are being met.
Contractor Management Officer
BONUS: Who is the CMO?
Safety factor that the engineering of steam locomotive boilers in FRA service must achieve.
4
If Operating Pressure = 250 PSI steam
Boiler must be engineered to withstand at least 1000 PSI steam
(49 CFR 230.24)