Waste
Training
General Site Trivia
Safe Work Permits
Wild (Not Work Related)
100

4 things required physically on a satellite accumulation container of hazards waste.

The words "Hazardous Waste"

Start Date of Accumulation

Chemical Contents of the Container

Hazard Communication (GHS pictograms, written words, etc.)


100

Name 3 of the chemical specific trainings maintained on site.

Acrylonitrile

Methylene Chloride

Hydrogen Sulfide

Isocyanate

Formaldehyde

Methylene Dianiline

Benzene

100

Members of this Evonik Allentown Functional Group may NOT serve as backup for R&D and Technology operations.

Evonik Allentown Facilities

100

Active Safe Work Permits posted where in R&D3?

Outside of staging by the dry ice bunker and ice machine.

100
Local industrial powerhouse that was responsible for building large bore ship cannons with the lowest failure rate in World War II.

Bethlehem Steel

Lives on (kinda) as Lehigh Heavy Forge

200

Waste that is spent or excess material that exhibits no hazardous characteristics but is generated by an industrial or R&D activity.

Residual Waste

200

2 items required before any personnel work in laboratories.

Completion of New Employee Appendix B

Specific DHR trainings

200

The 3 areas on campus that function as visitor areas where an escort is not required.

R&D 1 Collaboration Hub

R&D 3 A Wing Ideation Zone

R&D 3 B Wing Town Hall*

200

What is required upon immediate completion of hot work covered by a safe work permit?

Fire watch for 1 hour

200

Known for the largest model train convention on the US east coast as well as a peppermint patty coated in dark chocolate, this PA town is a rival to Hershey.

York, PA

300

Must accompany a satellite accumulation container of hazardous waste

Log sheet or WIMS form

300

This chemical specific training is for a carcinogenic amine. It discusses the importance of regular skin checks. These checks reference exposure presenting as yellow staining.

Methylene Dianiline (MDA)

300

The 3 lettered abbreviation for mechanical air handler units that maintain laboratories negative to the office hallways.

LEX (Example: LEX 600 in R&D 1 South)

300

What does a building evacuation do to all active Safe Work Permits for the same building?

Active Safe Work Permits are suspended.

300

Andy Dufresne once called Warden Norton this and it got him a long stint in solitary confinement.

Obtuse

400

The Contaminated Plant Scraps waste stream may not have (blank).

Free flowing liquids and/or solid chemicals.

400

Contractors must receive site training from Facilities at what time interval? 

Yearly

400

The amount of time after a work-related injury takes place that EH&S must be notified.

As soon as safety permits

400

Paper Safe Work permits must have these 2 physical characteristics.

Two part, self copying

Uniquely numbered

400

In Men in Black II, what breed of dog was Frank?

A pug

500

Name 2 recycling programs the site manages and tracks metrics for.

Nex Trex

K Cycle

KC Right cycle

Lion Glasses

Flavia Packs

500

This chemical specific training relates to a material stored and used in the R&D 1 building. A smelly material that is an irritant and asphyxiant. This will eventually cause nose blindness as concentrations over 100 ppm.

Hydrogen Sulfide (H2S)

500

The name of the computer system that monitors safety critical devices for the facility as well as laboratory operations.

Simplex

500

The person who is authorized in writing to oversee and assist the Contract Coordinator’s efforts. He or she ensures all documentation is in order and that corporate responsibilities are being met.

Contractor Management Officer

BONUS: Who is the CMO?

500

Safety factor that the engineering of steam locomotive boilers in FRA service must achieve.

4

If Operating Pressure = 250 PSI steam

Boiler must be engineered to withstand at least 1000 PSI steam

(49 CFR 230.24)