which should be done after every repair
After-use maintenance
black rubber seal that hold the Art head to the glass
V-Seal
looks like the night sky
Star
total time for a repair
7:30 complete repair.
Protect wiper blades and cowl below the repair area with a
paper towel
which should be performed regularly after every 30 repairs.
Interim maintenance
allows for proper placement of the Art head and removal.
Vacuum Release port
round in impact point
Bulls eye
windshield temperature
32°F and below 85°F
Hold the digital infrared thermometer about ___ off the glass and press the "MEAS" button, then release for the reading.
4in
must be carried out after every 90 repairs or two (2) months
Full maintenance
provides a separate air-tight seal around the repair area.
Glass O-Ring
round and star break
Combination
Evacuate break with Wedge for 3 minutes
Primer phase
Place the _____ on the inside of the windshield so the damage is below the midpoint of the mirror.
Mirror
will ensure that all remaining resin residues will leave the ART head.
Purging Procedure
where the repair resin enters the repair area.
Resin Injection Port
long single break
Crack
6 o’clock
You can hold the razer blade in hand.
Scraping off pit fill
is 200 - 250 repairs and must be replaced at these intervals to ensure quality repairs.
Service Life
channel through which air is extracted from the Art head.
Vacuum Port
how long can we fix
6 Inches
Cure for 3 minutes with the LED Lamp
CHANGE YOUR GLOVES
What is left in cars all the time.
Mirror