outages & emergencies
work orders
other WO
100

no power=

outage

100

when only portion of electricity is coming into the location

partial lights- part

100

temp emergency disconnect for repairs

TDEM

200
some power=

emergency

200

when a wire is burning inside or outside their home

WRBN

200

a reconnect after emergency

RCEM

300

occurs when there's a need to conduct maintenance within the electricity infrastructure

planned outage

300

when lights start to dim or flicker inside the location

VOLT

300

reconnect emergency after non payment

RCER

400

a letter indicating the amount of time they were out of service during a major event.
we do not offer this 

outage duration letter

400

when there is a pole burning or leaning in the area

EMER

400

emergency information to doc

INIC

500

what are the Entergy predict colors and time spans

green-couple hours
yellow-2/3 days

red- days to weeks
black- no estimation

500
when a power line is completely on the ground

and how should it be reported?

WRDN
should be reported as an emergency where bp states wire is down

500

this needs to be verified in all emergency work orders

permits