What does FLRA stand for?
What is Field Level Risk Assessment
What does SOP stand for?
What is Standard Operating Procedure
The maximum air loss rate for a straight truck is how many PSI
What is 3 PSI
If an incident occurs what's the time frame you should report it in
What is within 24hrs.
How long is concrete good for after batching time
Give an example of one thing to check for on your FLRA
What is flagman, level ground, excavation, overhead hazard, safe area around truck
Best way to ensure concrete flows off your chute at the start of a pour
What is the maximum compressor cut out pressure
What is 135 PSI
A leaking fuel tank is an example of what type of defect?
What is a major defect
How many minutes should you mix a full load for before leaving the plant?
What is 10 minutes.
True or false a FLRA can be changed after completion?
What is true
Should concrete be pushed or pulled off chute with scraper
What is pulled
Air brakes must do more work when
What is when the truck is loaded
Who is responsible for the safe operating condition of a vehicle
What is the operator and driver
What is the slump range for a curb machine
What is 40+-20
Your FLRA answer are stored where
What is on your ticket
When discharging hardened concrete the chute should be pointed where
The most common defect found during road side inspections
what is brakes out of adjustment
What is one of 2024 elements in Health & Safety?
What is Fatality elimination, CCM, Boots on the ground, contractor safety management, environmental
Your slump should be 80+-30 you arrive onsite at a 140. What should you do?
What is communicate with dispatch.
True or false, pouring should not start until all risks assessed and clear
What is true
When adding fibers from the crows nest what must not be in your hands going up ladder
What is the fibers
Air compressor cut-in must never be less than this many PSI
What is 80 psi
Name one piece of documentation required in truck cab
What is the slump and stone size for RMXS255311X
What is 80+-30 & 14ml.