What job in the last two months had 4 estimators bid on it?
Palm Eastern
What is the factor on water barrier and backfill?
1.5
Who submits permits for the A-Team?
Evelyn
How do we celebrate when we get a contract?
RING THE BELL
In the structure sheet, what percentage of grout is automatically picked up?
105%
What should the PE (Evelyn) be doing the whole time after she submits a permit?
Checking for corrections/progress of the permit
Who is the signer of contracts for the Commercial team?
Brandon Marchant
What is the markup/GM that is is on the change order tab?
15%
When do you have to request an update letter for a soils report?
If it is over 1 year old.
What is a very common additional add the General Contractors put into contracts that we do not pick up unless we provide an alternate for it?
Overexcavation
What piece of information on the retainer tab or screen walls tab gets missed sometime by Greg or Haden. Evelyn needs this information to submit a permit?
Engineering
What is the site map bubbled in red called?
Marked Plan
What two characters are put after the proposal number when you send your first change order to the client?
A1
How long of a stretch of wall do we need to have to be able to run our walls at a type 3?
450LF
What specific thing do you have to send to North Las Vegas for permitting?
Wall Design