Equipment, labor, and notes are part of this task.
What are daily logs
The US Federal Agency that sets and enforces workplace safety standards
What is OSHA
This document is used to list initial contract values, track allowances, alternates, contingencies, and changes.
What is a Cost Management Log
The term "GMP" is an acronym for what type of contract?
What is a Guaranteed Maximum Price
Habit #1
What is Be Proactive
The standard umbrella value ($) that CCC requires with subcontractors who perform work on our projects
What is $2,000,000
The chapter for steel erection standards and procedures within OSHA 1926 manual.
What is Subpart R?
A process that analyzes products or projects to improve their value and reduce costs. It's often used during the design phase.
What is Value Engineering "VE"
Project numbers starting with 94 and 95
What are service contracts
Important but not urgent
What is Quadrant II (Plan)
List at least 3 types of subcontracts that require Pollution Coverage on their Certificate of Insurance
What are Excavation, Mechanical, Enclosures (window, siding, roofing, EIFS), Abatement, Demolition Contractors.
When excavating a hole or trench, the edge of spoils pile must be ______ away from the edge of the excavation
What is 2 FEET
Information Technology, General Equipment, Project Management, Builders Risk, General Liability Insuranc
What are the standard markups included in our estimates
The day of each month billings are due to Owner
What is the 3rd business day of the month
CCC has been in business ____years
What is 75 Years
This part of a standard contract outline the fundamental terms and responsibilities of all parties involved, ensuring a shared understanding of project objectives and operational framework.
What are General Conditions of the Contract
PPE is an acronym for...?
What is Personal Protective Equipment
A predetermined amount or percentage of the budget set aside to cover unforeseen costs, risks, or changes that may arise during the project lifecycle. It acts as a financial cushion to help projects stay on budget and on schedule.
What is Construction Contingency
The term "CD's" refers to what standard construction exhibit
What are Construction Documents
CCC's tag line and pledge to clients
What is Quality Experienced
A contractual agreement where one party promises to compensate another party for losses or damages. It can also mean protection against a financial liability.
What is indemnity
GFCI Stands for what?
What is a Ground Fault Circuit Interrupter
"GFCIs are safety devices that protect people from electrical shock by shutting off power when they detect a ground fault"
The indirect expenses and overhead costs associated with the project. These expenses are not directly related to the construction work itself. Instead, they include administrative costs, bonds, testing, staffing, equipment rental, and temporary utilities.
What are General Conditions costs
That date of which an Owner can occupy and use their building for its intended use
What is Substantial Completion
A typical CCC design-build approach cycles through ____phases to deliver projects on time and on budget with full transparency.
What is 7 phases
Feasibility, Phase 1 Development, Phase 2 Commitment, Phase 3 Bid Docs, Phase 4 Construction, Post Construction, Warranty