Excavation
Excavation
General
General
100

What Sloping angle is suitable for any type of soil.

1 1/2 to 1 slope. 

100

What are the 4 types of Soil 

Stable Rock, Type A, B and C

100

Who is responsible for protecting workers from cave ins

The employer

100

What must you do before you dig. 

Call for Utility Locates.  811

200

What is the sloping angle for type B soil.

1 to 1 slope

200

How high must the top of the trench box be above any material that could cave in

18"

200

What is the minimum distance that excavated materials, tools, and other supplies be kept back from the excavation’s edge?

At least 2'

200

At what depth is Fall Protection Required

6'

300

What is the greatest hazard facing a worker while working in a trench:

Cave ins

300

How high can the trench box be above the bottom of the trench

2'

300

At what depth must a ladder, ramp, steps, or runway be present for quick worker exit:

4 feet or deeper 

400

Unless made in entirely stable rock, at what depth is a protective system required for a trench:

Any depth if the competent person notices a hazardous condition, or 5 feet deep and greater

400

Who determines the soil type

Competent person

400

Who is responsible for conducting Daily Excavation Inspections

Competent Person

400

Can you Bench Type C Soil

No

500

Do Excavation Inspections need to be Documented. 

Yes, excavation inspections must be conducted daily before each shift, and any time water accumulates in the excavation.

500

How much does 1 cubic yard of soil weight

3000 LBS

500

What are the 4 Types of Protective Systems

Shoring, Sloping, Benching and Shielding. 

500

What is the 1,2,3,4,5 Rule 

1 Competent person. Materials 2' away. Ladder 3' above. Ladders at 4'. Protection at 5'.