100

What does LOD stand for?

Level of development.

100

What parties attend the Kick-Off Call?

All trade partners, WT BIM and WT PM & Super.

100

How can the model be used during the const. phase by the WT team? List at least 2 examples

Pull planning

QC

Daily Huddles

Visuals

100

What does BIM stand for?

Building Information Modeling.

100

Trade partners can create shop drawings prior to sign-off being sent out for a coordinated area?

False. This is a risk.

200

Require purged or un-purged models from design team?

Unpurged.

200

What document is sent out when BIM coordination is complete?

Sign-off document.

200

List at least 2 benefits of having a BIM coordinated model.

Pre-fabrication

Reduces RFI's

Schedule benefits

Cost saving in long run by not re-working in field

Minimize accessibility issues

200

What does VDC stand for?

Virtual Design & Construction.

200

Both WT lead PM and WT BIM lead to collaborate prior to signing owner contract.

True.

300

Typical LOD trade partners model to?

Standard is 350 unless noted otherwise in owner contract.

300

Who provides the "Container for Coordination"?

Architect.

300

VDC tools that can be used to assist with QC efforts? List at least 2 tools.

Navis (Laser Scanning)

OpenSpace (BIM+ feature)

Cupix (Spatial Collaboration feature)

Revizto (Collaborated online hub/AR feature *FREE with program)

BIM 360 Glue (Download model for field use)

300

What does BIMEP or BEP stand for?

BIM Execution Plan.

300

As-built models are being required by the owner nowadays. 

True.

400

Typical trade partners to buy out for BIM Coordination. List all 5 typical scopes.

*Note this is typical - all depends on owner contract.

Steel

Fire Protection

Plumbing

Mechanical

Electrical

400

How many days to trade partners have to correct open issues once WT sends out sign-off?

5 days.

400

What 2 types of coordinated shop drawings can be provided by trade partners from the coordinated model?

RCP and sleeve/penetration drawings.

400

What's included with 4D services?

Schedule.

400

Weekly coordination calls do not require WT PM or WT Super attendance.

False - BIM Process is a team effort!

500

What does an LOD 500 model?

Facility Management (non-geometric data).

500

When does the trade model population timeclock start?

After BIM Kick-Off call.

500

What happens if a trade partner forgets to add a 20' section of pipe to the model and it conflicts with another trade partner when it's being installed in the field? 

Trade partner who did not model 20' pipe is responsible for field coordinated and any costs related for conflicting trade partner to re-work their system.

500

What does a digital twin mean?

Model to represent real life construction.

500

AutoCad is considered a part of the BIM process. 

No, CAD (Computer-Aided Design) is not considered BIM (Building Information Modeling), though they are related and sometimes used together. CAD is a tool for creating designs, while BIM is a methodology that utilizes information-rich models throughout a building's lifecycle.