Keep It Civil (Civil)
Can You Measure Up (BMS)
Brand New (Branding)
Lift Off
100

This is the phase of the project where civil should be brought on board to evaluate the site.

What is preproposal or site planning due diligence

100

This piece of information is most commonly left out of requests for BMS Services.

What is the Building Address.

100

The ideal stage for Branding Services to be inserted into the project life cycle.

What is the Pursuit Stage?

100

WM's bold new vision to push boundaries, elevate work and create new opportunities.

What is Launch 2030?

200

This building code requirement(s) typically necessitate the involvement of the civil team on many tenant improvement and even some interior specific renovation projects

What are ADA, accessibility, or egress requirements.

200
This vital document is necessary to provide when requesting BMS services.

What is the BMS Checklist.

200

This four-letter word is a typical deliverable in identity development services.

What is LOGO?

200

Three awesome WM services that contribute to revenue and firm growth.

What are BMS, Branding and Civil Services?

300

This is needed for civil to begin design on any project

What is a site survey?

300

It is one of the best ways to ensure BMS is included in your TI/renovation projects.

What is including BMS in every proposal, even as a supplemental service.

300

A category of WM's service offering that provides visual cues for navigation.

What is Signage & Wayfinding?

300

The WM 2030 target size increase.

What is Double?

400

Civil linework is tied to this, which is why the civil linework is often found in a different location than the architectural linework within a CAD file.

What is the real-world coordinate system.

400

For BOMA (office standard), this is the dominant building feature to measure to on the exterior wall, if the feature is greater than or equal to 50% of the ceiling height.

What is the inside face of the window line.

400

A governing document requiring review before recommending exterior signage solutions.

What is the City Sign Ordinance?

400

This is where you should be tracking all your client and potential client interactions.

What is hubspot

500

This aspect of a project typically includes the design of drywells, cisterns, or biofiltration planters

What is storm water quality and/or storm water management

500

The correct method to add BMS Revit models into your production workflow.

What is model "linking".

500

The branding tool used to tell stories, to personalize the built environment and connect people to place.

What is Environmental Graphic Design?

500

This is the process of sharing existing contacts with other team members to gain successful introductions.

What is Leveraging Client Relationships