This is the manufacturer of choice for fiber cement siding.
What is Hardie?
This product is required to be installed two feet past the exterior heated wall.
What is ice and water shield?
Apple Roofing offers this many years of warranty for workmanship.
What is 7 ?
This is the first step in a roof replacement. (Hot Seat)
What is material drop off?
This activity refers to talking to all of the neighbors after performing an inspection.
What is knocking the 6-pack?
This material goes around all windows and doors when installing vinyl siding.
What is J-Channel
This nail is proprietary to Apple Roofing and gives extra holding power.
What is the Barnacle 300?
These are the three warranties that Apple Roofing is able to offer through GAF.
What are System Plus, Silver Pledge and WindProven.
This is the last step in the roofing process (Hot Seat).
This program generates leads and allows apple roofing to act as the eyes of the insurance carrier in the field. A desk adjuster still reviews inspection photos and initial estimate.
What is MRP (Managed Repair Program)?
This is the material that windows and fascia can be wrapped with.
What is aluminum?
This type of roofing material is known for its lifespan, but might not be covered by insurance due to a marring clause.
What is corrugated metal or standing seam metal?
Oh no! My roof is starting to look like it has a bad sun burn! (Type of defect)
What is blistering?
This document is required if there are changes to be made on a contract for pricing or materials.
What is a Change Order?
Being on site for this inspection is crucial to not only make sure that damage is found but also so that the homeowner knows we are there for them throughout the entire process.
What is the adjuster meeting?
This siding component is a break in the field components of siding, usually to create visual depth to an otherwise simple siding elevation.
What a frieze board?
This material is a common replacement for wood shake. Providing a similar look with a potentially longer life span.
These are the 4 materials required to offer a GAF Silver Pledge Warranty not including the field shingles.
What are ice and water shield, synthetic underlayment, starter strip, and hip and ridge cap.
This activity must be completed before a job may be moved from Completed to Invoiced.
What is a final inspection?
This program is an industry first of allowing Apple Roofing to complete inspections and repairs immediately without requring an adjuster to review the file.
What is TRP (Travelers Repair Program)?
This material is required to be installed above all penetrations.
What is drip cap?
These are the two classes of impact resistance for roofing shingles.
What are class 3 and 4?
This person needs to be notified of any warranties that have been sold so they may be processed.
Who is Evelyn?
These are the 5 documents needed to submit a job for approval.
What are; a signed contract, financial worksheet, color selection, acc. scope, and accuwaste.
The department helps ensure that the homeowner recieves all products and services that code requires.
What is the Supplement Department?