3-4-5 Method
Building Layout
Batter Boards
Right Angles
Foundation Basics
100

What is the purpose of using 3-4-5 method in construction?

To create a right angle

100

What is the first step in building layout?

Establishing corner points

100

What are batter boards used for in construction?

To establish and maintain building lines

100

What is the main purpose of achieving a right angle in construction?

To ensure the stability of a building

100

What type of foundation is often used with batter boards?

Pier and beam foundations
200

Which measurements are used in 3-4-5 method?

3 feet, 4 feet, 5 feet


200

How much smaller is the layout compared to the actual building size?

IT is not different

200

How high above the ground are batter boards typically set?

At least 6 inches

200

How can the right angle be extended further when using the 3-4-5 Method?

By pulling the string line tight and further through its newly established point

200

Why is it important to set foundation stakes correctly?

To ensure the building layout is accurate

300

How many points are used in the 3-4-5 method?

3

300

What tool is often to measure diagonal dimensions for building layout?

A tape measure

300

What should you check after placing the batter boards?

The dimensions and string lines

300

Which angle does the 3-4-5 Method help to create?

90 degree angle

300

What tool is commonly used to check the grade of the site during foundation work?

A rotary laser

400

IF we are doing the 3-4-5 method and we need longer dimensions to lay out the corner, what do we multiply each number by?

The same number for each one ie...if you multiply by 2 then all number are multiplied by that.

400

What is the purpose of pulling a triangle when laying out corners?

To ensure the dimensions are accurate

400

What is the purpose of adjusting the string lines after setting batter boards?

To avoid errors in construction later

400

What is the first measurement taken when laying out a right angle?

3 feet

400

Why might a survey crew be called to a building site?

To stake out property lines

500

What is the final outcome when the 3-4-5 method is applied correctly?

A perfect right angle

500

How many dimensions need to be checked to ensure the layout is square?

4 - each corner

500

What step is performed after setting up batter boards and adjusting strings?

Checking the layout for accuracy

500

Which of the following uses a perfect right angle?

a- sewing clothing

b- building a garage

c- painting walls

d- gardening

B- Building a garage

500

What is the last step before laying out post locations in foundation work?

Checking the layout for squareness