book 29
water systems
forms
volumes
misc
100

Fire hydrant gate valves may require ___ to ___ full turns to complete a shutdown.

18 to 26

100

Post 74 outlet gpm rating?

300

100

F18

Transfer

100

Examples of street closures that would warrant a Sig-Alert would be emergency incidents greater than how long?

30 min

100

There shall not be more than how many levels of a mezzanine 

2

200

What is the length of yellow webbing?

12

200

what are the different ways to find the system pressure in a modern high rise?

150 plus 5 per floor

Signage on the inlets

Building engineer 

On the actual fire pump

200

972

daily check sheet

200

Fireboat 2 is ____ in length.

99’

200

Winds over this mph render aerial not usuable. 

50 mph

300

What is the thickness of  the Air Cushion Model 70A?

8’

300

what determines the number of inlets that the building has

Number of risers

300

F-95

Hydrant testing 

300

Members on duty should retire between what hours?

2000-2300

300

Jackknife collision degrees warning 

65 and 85

400

Gib blocks are approximately ____ wide, ____ high and ____ thick and are installed every _______ across the underside of the door panel.

3” wide, 1” high and 1/2” thick; every 18 inches across the underside of the door panel

400

Regulating devices are used when the pressure exceeds what pressure?

Exceeds 150 psi

400

F366

private hydrant report

400

What is the maximum sick leave a member shall be allowed to use in a calendar year for illness in the member’s immediate family?

12

400

Tempered glass windows are identified by __-inch luminous or reflective decals in a lower corner which indicate they are “For Fire Department Use.”

3 inch

500

What is the rating of a 2-1 picket system?

2000 lbs

500

When would these buildings use orfice plates?

Upper floors less than 150 psi

500

F226

grievance 

500

Water heating appliances shall be set at a maximum of what?

140-150 degrees 

500

what is the max pressure the Pro S can pump in pressure?

300 psi