Project Management
Estimation
VDC
Service
100

What system does D.A. Dodd use for tracking cost/budgeting?

Viewpoint Vista


100

Name one of the estimating history phases? 

Hand Takeoff, Digital Takeoff, or Model Based/AI Estimating

100

What Does VDC Stand For?

Virtual Design & Construction

100

What does HVACR stand for?

Heating, Ventilation, Air Conditioning, Refrigeration

200

What phase of a project typically drags out longer than it should?

Close-Out Phase


200

What is the name of our estimating software program? (hint. one of the demonstration tools) 

Trimble AutoBid

200

Name one of the 3 key aspects of VDC

1. Constructability of the Design

2. Resolve Issues/Conflicts Before they Arise

3. Increased Efficiency.

200

What do we use to check the pressures within a A/C system?

We use our pressure gauges to check pressures, they can also be used to help troubleshoot issues that we may be having.