Non-Negotiables
Electrical Safety
100

There must be 100% utilization of these at all times when transporting packages in Aisles 

What is....Stow Carts
100

How many extension cords can you plug into each other?

What is...NONE!!! No Daisy Chains

200

This non-negotiable has to do with the AIAO process and where packages can be stored

what is...Zero packages in the front seat of the vans 

200

Where can refrigerators and microwaves be plugged into?

what is...directly to wall or power drop

300

These provide wellness checks on employees and provide insight to the effectiveness of first aid treatment. There is a zero tolerance for missing these. 

what are...icares

300

This is the appropriate method for securing cords off of the ground

what is...velcro

400

The use of these ensure proper package handling 

what are...finger scanners

400

This is a process to prevent hazardous electricity discharges 

what is...Lock out Tag out. 

500

This non-negotiable ensures cleanliness of the space and mitigates slips, trips, and falls.

What is...Zero Packages on Floor 

500

The following are the are the responsibility of who in the electrical safety procedure: 

1. Understand and assume accountability for this procedure.
2. Assign responsibility to implement and oversee effectiveness of this procedure.
3. Allocate an appropriate budget and/or resources to enable the implementation and continual improvement of this
procedure.
4. Assign responsibility for non-technical competency roles in relation to WHS procedures.

what is....the site leader