COORDINATION
CONSULTANTS
SUBMITTAL STATUS
MOCKUPS
LEGAL REQUIREMENTS
100

Responsible for the coordination of subcontractors

Who is the General Contractor?

100

This Structural Consultant specializes in large Arena Projects based out of Kansas City

Who is TT

100

A submittal worthy of review but missing key elements

What is Revise & Resubmit?

100

Mock up requirements are usually found here

What is the PROJECT MANUAL?

100

Key players in project

Owner, Designer, Contractorr

200

Responsible for the coordination of ceiling mounted items

Who is the Architect?

200

An architectural firm in Western Canada that specializes high profile projects

Who is DAILOG?

200
A fully executed Submittal with complete understanding of the design intent

What is approved

200

Mock up that becomes a part of the final work

What is IN-SITU MOCK UP?

200

Drawings and Project Manual

What are CONTRACT DOCUMENTS

300

Responsible for overseeing the entire project from an early design stage through to completion, with a key financial commitment tied to a Guaranteed Maximum Price (GMP).

Who is the Construction Manager at Risk (CMAR)


300
These engineers make the internal environment of buildings comfortable

What is Mechanical Engineer?

300

A submittal that lacks a complete understanding of the project requirements

What is REJECTED?

300

Identifying and correcting problems early avoids rework, delays, and material waste leading to this?

What is COST SAVINGS?

300
Vehicle for changing contract requirements without Contractor approval

What are Construction Change Directives?

400

Responsible for overseeing the planning, design, and execution of architectural projects, ensuring they are completed on time, within budget, and to the satisfaction of clients.

Who is the Architectural Project Manager

400

This consultant is often hired as a 3rd party by the owner and provides the foundation of the project

What is a geotechnical engineer?

400
A non-required submittal

What is REJECTED with comments stating THIS SUBMITTAL IS NOT REQUIRED FOR REVIEW

400

For aesthetic review (colors, finishes, textures)

What are VISUAL MOCKUPS?

400

AIA A201

What is Owner/Contractor Agreement

500

Create and implement marketing plans to showcase the firm’s portfolio, design capabilities, and market positioning

Who is Architectural Marketing Manager

500

An engineer who apply principles of physics, engineering, and acoustics to manage sound in both natural and built environments

What is an ACOUSTICAL ENGINEER?

500
A submittal with an understanding of most requirements of the project with a few errors

What is APPROVED AS NOTED?

500
Owner, Designer, Contractor

Who are the STAKEHOLDERS

500

Pricing Mechanism before proceeding with changes

What is a proposal request?