Tricky
Rebuild
Drybook
Documentation
Sales
100

What color is the black box on an airplane?

Orange

100

During demolition, this should remain straight and undamaged because the drywall installer will need it later.

Wall studs

100

What should be completed first?

Contact/date contacted
100

The S500 states that every mitigation project should begin with this process before equipment is placed or demolition begins.

Inspection

100

The best salespeople do this before explaining services, equipment, or pricing.

Ask questions and listening before offering solutions

200

If a rooster lays an egg on the peak of a barn roof, which side does the egg roll down?

Roosters don't lay eggs

200

Detaching every piece of baseboard in a room may make mitigation easier, but if this condition exists, rebuild may have to purchase all new trim instead of reinstalling it.

damaging or failing to label the baseboard

200

If a piece of equipment cannot be scanned, what can be done?

Manually enter the serial number. 
200

According to the S500, materials should not automatically be removed just because they are wet; instead, technicians should evaluate this.

Is it restorable

200

If you're doing this for most of the conversation, you're probably losing the sale.

Talking more than listening?

300

If you throw a blue stone into the Red Sea, what does it become?

Wet

300

Cutting drywall at random heights instead of a consistent height creates this problem for rebuild.

Additional drywall finishing and unnecessary labor

300

If equipment does not have a tag, what needs to happen?

Switch it out and red tag it. Correct new equipment to the full run duration of that type of equipment

300

According to the S500, this factor—not just visible moisture—must be considered when deciding whether a material should be removed.

Contamination

300

After a customer explains their concerns, you should repeat their concerns back and confirm you understand them by using this technique.

Paraphrasing and validating

400
What was King George VI's first name?

Albert Frederick Arthur George

400

Leaving nails, screws, and fasteners in framing after demo creates this issue for reconstruction

Safety hazard and slower installation

400

If you see something wrong with a job, who should you tell?

Assigned PM

400

The S500 emphasizes that drying is considered complete when materials have returned to this condition—not simply when they "feel dry."

Established drying goal/normal equilibrium moisture content

400

Instead of simply telling the customer to hire your company, successful mitigation professionals focus on this by explaining the drying process, insurance, and what to expect after today.

Educating the customer instead of just selling

500

If an electric train is traveling North at 60 MPH and the wind is blowing East, which way does the smoke blow?

What smoke? An electric train doesn't produce smoke.

500

The fastest rebuild projects usually begin with mitigation crews who consistently do this before leaving the jobsite.

clean, organize, and prepare the site for reconstruction

500

Why is a detailed opening statement important (cat/class, drying equipment set vs recommended)

Sets early expectations and can cause coverage concerns if not properly documented from the experts

500

The S500 recognizes that restoration plans are not static and should be modified based on this.

documented daily findings/monitoring results

500

To confidently close the job, a mitigation salesperson should follow these four key responses after hearing a customer's concern.

Aacknowledge, seek understanding, address objections, and gain agreement