What is the OBJECTIVE of RIC?
to assist or rescue a firefighter who becomes lost, missing, trapped and/or in distress.
If size-up indicates the need for more than one (1) RIC, the RIC Group Chief and/or RIC 1 Company Officer should communicate directly with I/C to request additional RIC(s) by __________?
activating a Box Alarm or higher through MABAS.
ASSIGNMENTS : The RIC Company Officer (RIC 1) should assign the RIC positions as follows:
Position #1 –
Position #2 –
Position #3 –
RIC Officer: TIC, RASP Bag, Radio, Large Hand light
Irons: TIC, Irons, Hydra Force, Radio, Hand light
Air: RIC SCBA, Radio, Hand light
DEACTIVATION: When the I/C determines that the RIC is no longer necessary at an incident, the deactivation can be based on:?
Completion of fire suppression operations
Minimal potential for structural collapse during overhaul
Minimal risk due to extreme weather conditions and/or firefighter fatigue
Scene is reasonably clear of any other dangerous condition(s) as determined by the I/C
Should a firefighter be reported as lost, missing, trapped and/or in distress, the I/C will: List the first 3 actions?
Initiate Mayday & Emergency Traffic Procedures
Immediately stop all radio communications
Maintain control of fireground
RIC will provide resources for the exclusive purpose of ?
rapid location, extrication, and removal/rescue of firefighters operating on the incident scene.
RIC has no other assignment and must not get involved in basic firefighting.
The RIC Group Chief and/or RIC 1 Company Officer will report and correct any extenuating fire ground hazards and unsafe actions acting in the role of ________?
Incident Safety Officer (ISO).
If manning allows: What are the following positions?
Position #1
Position #2
Position #3
Position #4
Position #5
RIC Officer: TIC, Radio, Large Hand light
Rope: RASP Bag, Radio, Hand light
Air: RIC SCBA, Radio, Hand light
Tools/Search: Irons, Hydra Force
Entry Control: Hand Tools or Specialty Tools Hand light
It is imperative that radio discipline is practiced at all times, especially during a “mayday” incident: How can that be accomplished?
Stop all unnecessary radio traffic immediately
The I/C will advise all companies not involved in the “mayday” to switch to an alternate fire ground frequency and then perform a PAR.
Advise all fireground companies and Chief Officers to switch to alternate radio frequency (e.g. from FG ____ to FG______)
Escalate the alarm ____ levels above current alarm, utilizing MABAS
red to white
two
RESPONSE
Incident Command (I/C) will assign the following at all working fire incidents:
Code Four
Incident Safety Officer/RIC Group Chief
4th-due Engine Company: RIC 1
1st-due Ambulance: “2in/2Out”crew
Ambulance crew shall act as “Two-Out” team for interior fire attack crew on initial General Alarm/Code 4 response, until second ambulance arrives.
EQUIPMENT – Depending on the structure and situation, the RIC will assemble the proper tools & equipment in a _______ ______ (if possible) including but not limited to:
R.A.S.P. Rope Bag (______’ minimum)
Thermal Imaging Camera (TIC)
Hand Tools (____________)
stokes basket
150'
Halligan, Sledge, Axe, Wire Cutters etc.
PRE-DEPLOYMENT TASKS & TACTICS
The RIC Group Chief and RIC Company Officer(s) shall ?
continuously monitor fireground strategic and tactical actions, firefighting progress, and the location of all suppression companies.
SPECIAL CONSIDERATIONS
The RIC will provide the resources on the scene for the exclusive purpose of rapid search, and rescue of firefighters operating on the incident scene. RIC has no other assignment and must not get involved in basic firefighting. T/F
True
Conduct what, assign and consider what should a firefighter be reported lost , missing, trapped and/or in distress
Send RIC back-up from staging to the RIC Group Chief
Personnel Accountability Report (PAR)
Assign additional RIC(s) to arriving companies
Consider an EMS Box Alarm or higher utilizing MABAS
Consider a special rescue response (e.g. structural collapse unit)
PROCEDURE
RIC STAGING & SIZE UP
The RIC Group Chief and/or RIC 1 Company Officer will report directly to the I/C and set up RIC staging. The staging area is best determined by:
Size and type of structure
Location of the fire and heaviest concentration of firefighters.
Accessibility to building entrances.
➢ NOTE: High-Rise Operations RIC(s) will stage one floor below the fire floor
EQUIPMENT – Depending on the structure and situation, the RIC will assemble the proper tools & equipment in a stokes basket (if possible) including but not limited to:
Hand Lights
Door Chocks/Door _______ ______
RIC SCBA & Spare SCBA BottlesLife Safety Rope &______________
Personal _______/Personal _______
Control Devices
Z-Rig haul system
rope webbing
The RIC Group Chief and RIC Company Officer(s) shall anticipate immediate what needs?
ground ladders raised to the fire floor and above the fire floor as additional means of escape, removal of barriers that could impede firefighter egress, etc.) of interior crews, and for the RIC should a “mayday” be transmitted
The RIC shall not be rotated by the I/C with other companies. It is important for the RIC to maintain a constant __________, a constant __________, and a constant ________ throughout the incident.
monitoring of the fire ground operations
structure size-up
state of preparedness
The I/C must try to determine the nature of “mayday” (lost, missing, trapped, and/or distress) and any other information that will assist the RIC rescue efforts (e.g. location in the building, number of firefighters involved in the “mayday”, etc.)
The I/C will order the deployment of the RIC through the RIC _________.
Group Chief.
The RIC Group Chief and/or RIC 1 Company Officer will conduct a visual size-up of all sides of the building (_____________) and shall report their findings (_________________________) to all RIC personnel. During size-up the firefighters assigned to RIC will remain together and stage the RIC tools.
(floor below for a high-rise)
(construction features, forcible entry problems, interior stairwells, special hazards, fire location, etc.)
EQUIPMENT – Depending on the structure and situation, the RIC will assemble the proper tools & equipment in a stokes basket (if possible) including but not limited to:
Power Tools
__-__ saw with_____ ______
Stokes Basket
K-12
appropriate blades
When RIC is activated and deployed, the crews will be deployed, list them. 1st, 2nd and 3rd
➢ Additional (or fewer) RIC(s) may be needed to accomplish firefighter rescue, dependent on specific scenario.
The first RIC deployed is the Entry Crew (Locate)
The second RIC deployed is the Extrication Crew (Package)
The third RIC deployed is the Extraction Crew (Remove)
In extreme situations when the RIC(s) must be used by the I/C for an urgent fire ground task (e.g. rescue of civilians, attack of fast spreading fire, etc.) the I/C will?.
immediately request a Box Alarm or higher through MABAS for additional RIC(s)