HSE
AUTOBAGGER
RANDOM
master bagger
R-PACK
100

NAME ALL REQUIRED PPE FOR COLD END AREA

SAFETY GLASSES, HEARING PROTECTION, SAFETY SHOES, BUMP CAP. SAFETY VEST

100

HOW MANY LOTO POINTS ARE ON THE FOLDER

2


100
WHAT DOES LOTO STAND FOR

LOTO

100

pushes the Product out of the Snout

Ram

100

THE 2 PHOTOEYES AT THE ROLL BANDER ARE USED FOR WHAT TWO PRODUCTS

4 FT AND 8 FT

200

WHAT DOES TWI STAND FOR 

TRAIN WITHIN INDUSTRY

200

dump system transports product to what part of the autobagger

pinch breaks

200

BEFORE APPLYING LOTO LOCK, WHATS THE 1ST STEP YOU TAKE

NOTIFY ALL AFFECTED EMPLOYES

200

The system that "sees" the Product coming into the Masterbagger

Vision system

200

WHAT DOES THE "R" stand for R-VALUE

RESISTANCE

300

WHAT YEAR WAS TWI CREATED

1940

300

what happens after the shot pins retract that are holding the batts??

second set of forks come and compress batts into the cubby

300

what holds the forks and moves them up and downon the Auto bagger

carriage

300

Part of the masterbagger that "smooshes" the batts togther 

Compression Chamber

300

WHAT 2 PRODUCTS TO INTO THE MASTERBAGGER

BATTS AND RETAIL

400

FIRE NEEDS WHAT 3 THINGS TO COMBUST FUEL, _________ AND OXYGEN

HEAT

400

what type of motors are we using on most the knauf equipment

Servo

400

HOW MANY MASTERBAGGERS DO WE HAVE

3

400

The last Part of the Masterbagger before it enters the warehouse

accumulation area

400

WHATS THE 1ST STEP AFTER PRODUCT LEAVES ROLL IN A BAG

HITS THE ROLL BREAKER

500

yOU NEED TO USE WHAT TOOL TO UN CLOG A JAM ON THE AUTO BAGGER

PICK STICK

500

what are the 3 types of energy that we need to LOTO on the Auto baggers

gravity, Pnuematic, and Electrical

500

BESIDES DURING A CHANGE OVER, WHEN ELSE WOULD WE HIT FINISH STACK ON THE AUTO BAGGER

TO CLEAR A JAM AND RETURN THE AUTO BAGGERS TO TGE HOME POSITION

500

THE CONVEYOR THAT CARRIES THE MATERIAL INTO THE MASTERBAGGER

INFEED CONVEYOR

500

EXPAIN THE STEPS OF THE R-PACK PROCESS

SHRINK WRAP

OVEN

HOLE PUNCHER

BANDER