Pre-engineered
Pre-cast
Ironwork
Arc gouging
100

Wall panels are designed to carry 

Lateral wind loads

100

When lifting devices must be placed in pre cast members on the job site, the safety factor for the device should be 

4/1

100

The vertical strips connecting the upper and lower sides of a truss are called

Webs

100

The jet orifices of the torch must be located_____ the torch electrode

Under

200

End walls and side sheathing are attached using 

self tappers

200

Rustication strips are used to

Form reveals in the panels

200

The physical condition involving the degree of stretch of wire rope, rod, or slings is called

Tension

200

Light duty gouging or cutting is typically done with a____ welding machine

200A

300

High strength bolts on rafter beams are tightened to spec by using

Turn of the nut method

300

Bond breaker must thoroughly cover the casting surface and should not be left on more than 

2 days

300

Ironworkers must consider the design and strength of a truss before

Its rigged

300

The electrode tip should be no farther than____ from the contacts to prevent overheating

6"

400

When stack drilling, drill in a stack of no more than

15

400

Grout setting pads are added to footings in order to

Hold the panel until it is grouted

400

Trusses that must be assembled on site are typically assembled

On their sides

400

The CAC-A process uses a high current electric arc between the base metal and the end of a

Carbon graphite electrode

500

Where side walls are attatched to each other alone, the attatchment is called

Stitch screw

500

A support built into a wall panel and designed to carry floor or roof loads is called a

Corbel

500

A nonbearing wall panel attached to the steel or concrete structure of a building is known as

Curtain wall

500

Electrodes designed for AC current contain a rare earth_____ material

Arc stabilizing