A Formal Work Package with OQE
What is a Controlled Work Package
An Electoplating Repair Record
What is a QA-17B
The first rule of planning?
What is find someone else to do it
The name of our Subsafe Director
Who is Chris Mcneil
This sleepy-eyed silver fox is our current senior planner
What is Keith Clark
A routine job that does not require a WAF
What is an AWR
April 10, 1963
What is the date the USS Thresher sank
This SWR code is required when material listed on the JML requires turn-in
What is SWR 53
When ordering CIM material this is the DWC
Who is C/612
When not at work this ship sup can probably be found on a river bank
Who is Joe Mohs
Also known as the Shipboard Navy Identification and Technical Consolidated Handbook
What is the SNITCH
QA Form blocks designated by this are for E&PD
What are Red Diamonds
The out of work sequencing NOTE go in this section
What is the procedure section
When ordering CIM material this is the DWC
Who is C/612
If work is done on this system it may need to be done in 12 hours or less
What is Missile Gas
A revision is required for a change to the scope of work, change to the boundary of the work, change to the testing requirements and this change
When filling out an QA-34, all joints assembled using "assembled per FWP" must include this piece of information from the FWP
An extensive cost estimate based on engineering drawings, material lists and/or type āEā uniform methods and standards
What is a Class A detailed cost estimate
When making a credit card purchase do not go over this amount
What is $10,000
The process used for Re-Entry Control exceptions or exceptions to retest requirements for mechanical joints
What is a controlled assembly
When spicing an O-Ring is authorized by technical authority, it must be from this material
What is Buna-N